9
Inspection and maintenance
Logano plus GB402 - Subject to technical modifications!
52
9.14
Inspection and maintenance reports
The inspection and maintenance reports are also
designed as templates and may be photocopied.
B
Sign and date the completed inspection work.
Inspection work
Page
Full load
Partial load
Full load
Partial load
1.
Check the general condition of the heating system
(visual inspection and function check).
2.
Check system areas that are in contact with gas or
water for the following:
-
Internal leaks
-
Visible signs of corrosion
-
Signs of ageing
3.
The concentration of anti-freeze/additives in the
heating water (observe manufacturer's instructions and
the details in the operator's log).
Concentration:________%
Concentration:________%
4.
Check the heating system water pressure.
43
-
Pre-charge of the expansion vessel
(
Æ
expansion vessel installation instructions).
-
Operating pressure
43
5.
Check the burner and heat exchanger for
contamination; shut down the heating system
for this step.
6.
Check the siphon and the condensate tray;
shut down the heating system for this step.
7.
Check electrode block; shut down the heating system
for this step.
47
8.
Check the gas supply pressure.
33
9.
Check the ventilation and extract air apertures,
and the flue connection.
31
10.
Record actual values:
35
-
Draught
________Pa
________Pa
________Pa
________Pa
-
Gross flue gas temperature t
A
________ °C
________ °C
________ °C
________ °C
-
Air temperature t
L
________ °C
________ °C
________ °C
________ °C
-
Net flue gas temperature t
A
- t
L
________ °C
________ °C
________ °C
________ °C
-
Carbon dioxide content (CO
2
)
or oxygen content (O
2
)
_________%
_________%
_________%
_________%
-
CO value, free of air
_______ppm
_______ppm
_______ppm
_______ppm
11.
Carry out function checks:
36
-
Check the ionisation current.
________μA
________μA
________μA
________μA
12.
Check for leaks during operation.
36
13.
Check that the control unit is set correctly for the
prevailing conditions (see control unit documentation).
–
14.
Final checking of inspection work.
–
Confirm professional inspection
Company stamp/date/signature
Tab. 16