15
Boiler inspection and maintenance
Logano GC 144 II – 6 720 808 893 (2017/02)
25
15.7
Maintenance protocol
Please check off the maintenance work as it is completed and record the
measured values.
Follow the instructions on the following pages.
Maintenance work
Page
Date:
Date:
1.
Inspection of the flue system including combustion
air, inlet and outlet openings
2.
Gas manifold pressure
3.
Inspection of burner
4.
Cleaning of boiler
5.
Cleaning of burner
6.
Measuring gas supply pressure
–––––––inches W. C.
–––––––inches W. C.
7.
Measuring orifice pressure
–––––––inches W. C.
–––––––inches W. C.
8.
Checking for leaks in operating condition
9.
Checking pilot burner flame
10.
Checking main burner flame
11.
Check the vent damper
12.
Check high temperature limit control
13.
Check the area around the boiler for flammable
materials, gasoline or corrosive liquids.
14.
Confirm maintenance
Confirmation of correct maintenance
(company stamp, signature)
Table 12 Maintenance protocol
Содержание GC144/3
Страница 32: ......