7
Boiler installation
Logano GC 144 II – 6 720 808 893 (2017/02)
9
Installation of B-kit
The relief valve and the pressure/temperature gauge are mounted on the
boiler supply manifold which is attached to the VK (supply) connection
of the boiler (included in B-kit).
Installing boiler supply VK:
▶ Remove factory installed plastic inserts from boiler supply (VK),
boiler return (RK) and boiler drain (EL) connections.
▶ Install the 1¼ " NPT nipple into boiler supply, the 1" NPT nipple into
boiler return and ¾ " male NPT drain valve into boiler drain
connection.
▶ Install 90° 1¼ " x 1¼ " NPT on 1¼ " NPT supply nipple and face
upward and install 90° 1¼ " x 1" NPT elbow on return nipple and face
in desired direction.
▶ Install GC 144 II 1¼ " x 1¼ " NPT supply manifold into supply
connection (VK) of the boiler. Do NOT place on return connection of
the boiler!
▶ Install first 90° ¾ " street elbow in upper ¾ " NPT tapping of GC 144 II
1¼ " supply manifold and install pressure relief valve into this ¾ "
tapping. Make sure to orient the discharge of the relief valve
horizontally. Install the temperature/pressure gauge in the lower ¾ "
tapping of the supply manifold.
Fig. 9
Installation of B-kit
[1]
Pressure relief valve ¾ "
[2]
90° ¾ " street elbow
[3]
GC 144 II 1¼ " supply manifold
[4]
Temperature/pressure gauge
[5]
90° 1¼ " NPT elbow
[6]
1¼ " x 1" NPT nipple
[7]
Boiler drain ¾ " NPT (backside of boiler)
[8]
90° 1¼ " NPT elbow
[9]
1" NPT nipple
7.3
Electrical connections
The electrical connections of the boiler must be made as specified by the
local codes and the current regulations of the National Electrical Code,
ANSI/NFPA–70.
The boiler must be grounded as specified by the regulations of the
relevant local authorities; otherwise follow the regulations of the
National Electrical Code, ANSI/NFPA–70.
The boiler is fully functional with the factory installed aquastat and the
field installed vent damper and heating system circulation pump.
Power supply connection.
Install incoming power to the boiler per local and state codes.
▶ Install an ON/OFF switch near the boiler per local code requirements.
Fig. 10 ON/OFF switch (emergency shutoff switch)
Install the relief valve after the leak test (
page 11).
The relief valve must be installed in a vertical position.
The relief valve must also be installed in accordance with
the requirements of the ANSI/ASME Boiler and Pressure
Vessel Code, Section IV.
1
2
3
4
5
7
8
6
VK
EL
RK
9
6 720
8
04 440-09.2T
We recommend installing a y-strainer (accessory) in the
boiler return connection to reduce built-up of debris on
the water side inside the boiler.
Ensure compliance with all state and local regulations
pertaining to the installation of boiler systems.
WARNING:
Fire danger due to exposure to hot water
pipes.
▶ Maintain a minimum clearance of two inches
between non-insulated pipes carrying hot water and
combustible walls and surfaces in the boiler room. A
minimum of 1" high quality pipe insulation is required
to permit direct contact with combustible surfaces.
When making the electrical connections please observe
the following guidelines:
▶ Perform only electrical work, if you possess the
required certification for such work. When you do
not have the required certification, have the
electrical work performed by a certified electrician.
▶ Observe all local and state installation regulations.
6 720 804 440-10.1T