10
Inspection and servicing
Logano plus GB402 – 6 720 820 700 (2018/01)
45
Demand-based maintenance
Page
Date: ______
Date: ______
1.
Shutting down the heating system.
2.
Clean the burner and heat exchanger.
3.
Replace gaskets on the cleaning cover of the heat exchanger.
4.
Replace the electrode block.
5.
Cleaning the siphon.
6.
Clean the condensation catch pan.
7.
Replace the mixture manifold gasket (O-ring).
8.
Carry out a function check.
Confirm professional maintenance.
Company stamp/signature
Table 20
Date: ______
Date: ______
Date: ______
Date: ______
Date: ______
1.
2.
3.
4.
5.
6.
7.
8.
Company stamp/signature Company stamp/signature Company stamp/signature Company stamp/signature Company stamp/signature
Table 21
Содержание GB402-320-5
Страница 62: ...Logano plus GB402 6 720 820 700 2018 01 62 Notes...
Страница 63: ...Logano plus GB402 6 720 820 700 2018 01 63 Notes...
Страница 64: ......