background image

Recognize safety information. This is the safety-alert symbol

.

When you see this symbol on the furnace and in instructions or
manuals, be alert to the potential for personal injury.

Understand the signal words DANGER, WARNING, and CAU-
TION. These words are used with the safety-alert symbol. DAN-
GER identifies the most serious hazards which will result in severe
personal injury or death. WARNING signifies a hazard which
could result in personal injury or death. CAUTION is used to
identify unsafe practices which would result in minor personal
injury or product and property damage.

These instructions cover minimum requirements and conform to
existing national standards and safety codes. In some instances,
these instructions exceed certain local codes and ordinances,
especially those that may not have kept up with changing residen-
tial construction practices. We require these instructions as a
minimum for a safe installation.

ELECTROSTATIC DISCHARGE (ESD) PRECAUTIONS

PROCEDURE

CAUTION:

Electrostatic discharge can affect electronic

components. Take precautions during furnace installation
and servicing to protect the furnace electronic control.
Precautions will prevent electrostatic discharges from
personnel and hand tools which are held during the
procedure. These precautions will help to avoid exposing
the control to electrostatic discharge by putting the
furnace, the control, and the person at the same electro-
static potential.

1. Disconnect all power to the furnace. DO NOT TOUCH

THE CONTROL OR ANY WIRE CONNECTED TO THE
CONTROL PRIOR TO DISCHARGING YOUR BODY’S
ELECTROSTATIC CHARGE TO GROUND.

2. Firmly touch a clean, unpainted, metal surface of the

furnace chassis which is close to the control. Tools held in
a person’s hand during grounding will be satisfactorily
discharged.

TABLE 2—DIMENSIONS (IN.)

UNIT SIZE

A

D

E

VENT CONN

SHIP. WT (LB)

024050

14-3/16

12-9/16

12-11/16

4

124

036050

14-3/16

12-9/16

12-11/16

4

127

024070

14-3/16

12-9/16

12-11/16

4

141

036070

14-3/16

12-9/16

12-11/16

4

145

036095

17-1/2

15-7/8

16

4

154

048095

17-1/2

15-7/8

16

4

154

048115

17-1/2

15-7/8

16

4

171

048115

21

19-3/8

19-1/2

4

181

060135

24-1/2

22-7/8

23

5

192

Fig. 1—Dimensional Drawing

A88324

3

16

2

15

16

13

16

11

16

1

8

10 

1

4

1

16

1

8

1

4

10 

1

4

1

16

1

8

16 

1

16

13 

16

19

11

16

13

16

11

16

20

28 

1

2

39 

7

8

D

5

8

″ 

TYP

1

″ 

TYP

E

A

AIRFLOW

OUTLET

INLET

1

2

″ 

DIA

THERMOSTAT 
WIRE ENTRY

7

8

″ 

DIA

ACCESSORY

7

8

″ 

DIA

ACCESSORY

DIMPLES TO DRILL HOLES
FOR HANGER BOLTS (4 PLACES)
IN HORIZONTAL POSITION

ADDITIONAL 

7

8

″ 

DIA K.O. ARE

LOCATED IN THE TOP PLATE
AND BOTTOM PLATE

NOTE:

7

8

″ 

DIA HOLE

POWER ENTRY

1

2

″ 

DIA

R.H. GAS ENTRY

7

8

″ 

DIA

ACCESSORY

3

4

″ 

DIA HOLE

GAS ENTRY

VENT CONNECTION

—2—

Содержание GAS-FIRED INDUCED-COMBUSTION FURNACES 373LAV

Страница 1: ...safety codes In the United States follow all safety codes including the National Fuel Gas Code NFGC NFPA No 54 1992 ANSI Z223 1 1992 In Canada refer to the current edition of the National Standard of...

Страница 2: ...during the procedure These precautions will help to avoid exposing the control to electrostatic discharge by putting the furnace the control and the person at the same electro static potential 1 Disc...

Страница 3: ...n fire electrical shock or other conditions which may cause personal injury loss of life or property damage Consult a qualified installer service agency local gas supplier or your distributor or branc...

Страница 4: ...an equal or greater amount of air is supplied to the room B Confined Space A confined space has volume less than 50 cu ft per 1000 Btuh of the total input ratings of all appliances installed in that...

Страница 5: ...OUTDOORS 1 SQ IN PER 4000 BTUH RETURN AIR VENT THROUGH ROOF CATEGORY I D B A C E 1 SQ IN PER 4000 BTUH DUCT TO OUTDOORS SUPPLY AIR 1 SQ IN PER 2000 BTUH DUCTS TO OUTSIDE 12 MAX 12 MAX CONFINED SPACE 1...

Страница 6: ...red length 1 X 3 8 in flat washer 3 8 in lockwasher and 3 8 in nut Dimples are provided for hole locations See Fig 1 Since horizontal crawlspace installation is very similar to the attic installation...

Страница 7: ...ent trap in the riser leading to the furnace The trap can be installed by connecting a tee to the riser leading from the furnace Connect a capped nipple into the lower end of the tee The capped nipple...

Страница 8: ...nergized with 115v 1 5 amp maximum during blower motor operation 2 Humidifier HUM Quick connect terminal HUM and screw terminal Com are provided for 24 v humidifier connection The terminals are energi...

Страница 9: ...FIELD SUPPLIED FUSED DISCONNECT CONDENSING UNIT TWO WIRE FURNACE R G C W C R G Y GND GND FIELD 24 VOLT WIRING FIELD 115 208 230 460 VOLT WIRING FACTORY 24 VOLT WIRING FACTORY 115 VOLT WIRING 208 230...

Страница 10: ...satisfied R G and R Y circuits are broken Furnace blower and EAC continue operating on cooling speed for an additional 90 sec 3 Continuous blower mode NOTE EAC 1 terminal is energized with 115v whene...

Страница 11: ...ESSURE SWITCH SPST N O TEST TWIN COMPONENT TEST TWIN TERMINAL TRAN TRANSFORMER 115VAC 24VAC JUNCTION UNMARKED TERMINAL PCB TERMINAL FACTORY WIRING 115VAC FACTORY WIRING 24VAC FIELD WIRING 115VAC FIELD...

Страница 12: ...Specific gravity 0 58 Therefore Orifice No 44 Manifold pressure 3 6 in wc The furnace is shipped with No 43 orifices Therefore in this example all main burner orifices must be changed and the manifold...

Страница 13: ...9 3 4 3 7 3 2 40 41 39 3 5 3 8 3 3 40 38 39 3 6 3 2 3 4 40 38 39 3 8 3 3 3 5 38 39 3 4 3 6 38 39 3 4 3 7 890 41 42 3 2 3 6 41 42 3 4 3 7 40 41 3 2 3 5 40 41 3 3 3 6 40 41 39 3 4 3 7 3 2 40 41 39 3 5 3...

Страница 14: ...nd operates if there is a motor failure TABLE 8 GAS RATE CU FT HR SECONDS FOR 1 REVOLUTION SIZE OF TEST DIAL SECONDS FOR 1 REVOLUTION SIZE OF TEST DIAL 1 cu ft 2 cu ft 5 cu ft 1 cu ft 2 cu ft 5 cu ft...

Страница 15: ...n properly and correct condition e Turn off 115 v power to furnace f Reconnect inducer motor wires replace control door and turn on 115 v power to furnace 4 Check auxiliary limits when used a Turn off...

Страница 16: ...ing popular video based formats and materials All include video and or slides plus companion book Classroom Service Training plus hands on the products in our labs can mean increased confidence that r...

Отзывы: