background image

b. If combustion air is taken from the outdoors through

horizontal ducts, the openings and ducts MUST have at
least 1 sq in. of free area per 2000 Btuh of the total input
for all equipment within the confined space.

c. When ducts are used, they must be of the same cross-

sectional area as the free area of the openings to which
they connect. The minimum dimension of rectangular
ducts must not be less than 3 in. (See Fig. 3.)

III.

SUPPLY-AIR

PLENUM

INSTALLATION

(DOWN-

FLOW)

A.

Installation On a Concrete Slab

1. Construct hole in floor per dimensions in Fig. 4 and Table

3.

2. Install plenum and furnace as shown in Fig. 5.

B.

Installation On a Combustible Floor

1. Cut and frame hole in floor per dimensions in Installation

Instructions packaged with downflow subbase.

2. When completed, downflow subbase, plenum, and furnace

(or coil casing when used) should be installed as shown in
Fig. 6.

Fig. 3—Air for Combustion and Ventilation

(Outside Air)

A93388

DUCTS TO

OUTDOORS

1 SQ IN.
PER 4000
BTUH

*

RETURN

AIR

VENT
THROUGH
ROOF
(CATEGORY I)

D

B

A

C

E  

1 SQ IN.
PER 4000
BTUH

DUCT

TO

OUTDOORS

SUPPLY AIR

1 SQ IN.
PER 2000
BTUH*

DUCTS

TO

OUTSIDE

12

 MAX

12

 MAX

CONFINED

SPACE

12

MAX

12

MAX

1 SQ IN.
PER 4000
BTUH

*

OUTDOORS

1 SQ IN.
PER 4000
BTUH

*

1 SQ IN.
PER 2000
BTUH*

12

 MAX

Use any of the following
combinations of openings:
A & B     C & D    D & E     F & G

NOTE:

*Minimum dimensions of 3-In.

F

G

For Example:

373LAV FURNACE

INPUT BTUH

FREE AREA PER

OPENING (SQ IN.)

ROUND PIPE

(IN. DIA)

46,000

11.5

4

69,000

17.3

5

92,000

23.0

6

115,000

28.8

7

135,000

34.5

7

For Example:

373LAV FURNACE

INPUT BTUH

FREE AREA PER

OPENING (SQ IN.)

ROUND PIPE

(IN. DIA)

46,000

23.0

6

69,000

34.3

7

92,000

46.0

8

115,000

57.6

9

135,000

69.0

10

TABLE 3—OPENING DIMENSIONS (IN.)

FURNACE CASING

WIDTH

A

B

Heat-Only

Heat/Cool*

14-3/16

13-1/8

19-5/8

19-7/16

17-1/2

16-7/16

19-5/8

19-7/16

21

19-7/8

19-5/8

19-7/16

24-1/2

23-7/16

19-5/8

19-7/16

* These dimensions apply when a model CB or CD Evaporator Coil casing is
to be installed.

Fig. 4—Floor Opening for Concrete Slab

A73382

HOLE IN

FLOOR

A

B

Fig. 5—Furnace on a Concrete Slab (Non-Garage

Installation)

A73383

FURNACE

PLENUM

—5—

Содержание GAS-FIRED INDUCED-COMBUSTION FURNACES 373LAV

Страница 1: ...safety codes In the United States follow all safety codes including the National Fuel Gas Code NFGC NFPA No 54 1992 ANSI Z223 1 1992 In Canada refer to the current edition of the National Standard of...

Страница 2: ...during the procedure These precautions will help to avoid exposing the control to electrostatic discharge by putting the furnace the control and the person at the same electro static potential 1 Disc...

Страница 3: ...n fire electrical shock or other conditions which may cause personal injury loss of life or property damage Consult a qualified installer service agency local gas supplier or your distributor or branc...

Страница 4: ...an equal or greater amount of air is supplied to the room B Confined Space A confined space has volume less than 50 cu ft per 1000 Btuh of the total input ratings of all appliances installed in that...

Страница 5: ...OUTDOORS 1 SQ IN PER 4000 BTUH RETURN AIR VENT THROUGH ROOF CATEGORY I D B A C E 1 SQ IN PER 4000 BTUH DUCT TO OUTDOORS SUPPLY AIR 1 SQ IN PER 2000 BTUH DUCTS TO OUTSIDE 12 MAX 12 MAX CONFINED SPACE 1...

Страница 6: ...red length 1 X 3 8 in flat washer 3 8 in lockwasher and 3 8 in nut Dimples are provided for hole locations See Fig 1 Since horizontal crawlspace installation is very similar to the attic installation...

Страница 7: ...ent trap in the riser leading to the furnace The trap can be installed by connecting a tee to the riser leading from the furnace Connect a capped nipple into the lower end of the tee The capped nipple...

Страница 8: ...nergized with 115v 1 5 amp maximum during blower motor operation 2 Humidifier HUM Quick connect terminal HUM and screw terminal Com are provided for 24 v humidifier connection The terminals are energi...

Страница 9: ...FIELD SUPPLIED FUSED DISCONNECT CONDENSING UNIT TWO WIRE FURNACE R G C W C R G Y GND GND FIELD 24 VOLT WIRING FIELD 115 208 230 460 VOLT WIRING FACTORY 24 VOLT WIRING FACTORY 115 VOLT WIRING 208 230...

Страница 10: ...satisfied R G and R Y circuits are broken Furnace blower and EAC continue operating on cooling speed for an additional 90 sec 3 Continuous blower mode NOTE EAC 1 terminal is energized with 115v whene...

Страница 11: ...ESSURE SWITCH SPST N O TEST TWIN COMPONENT TEST TWIN TERMINAL TRAN TRANSFORMER 115VAC 24VAC JUNCTION UNMARKED TERMINAL PCB TERMINAL FACTORY WIRING 115VAC FACTORY WIRING 24VAC FIELD WIRING 115VAC FIELD...

Страница 12: ...Specific gravity 0 58 Therefore Orifice No 44 Manifold pressure 3 6 in wc The furnace is shipped with No 43 orifices Therefore in this example all main burner orifices must be changed and the manifold...

Страница 13: ...9 3 4 3 7 3 2 40 41 39 3 5 3 8 3 3 40 38 39 3 6 3 2 3 4 40 38 39 3 8 3 3 3 5 38 39 3 4 3 6 38 39 3 4 3 7 890 41 42 3 2 3 6 41 42 3 4 3 7 40 41 3 2 3 5 40 41 3 3 3 6 40 41 39 3 4 3 7 3 2 40 41 39 3 5 3...

Страница 14: ...nd operates if there is a motor failure TABLE 8 GAS RATE CU FT HR SECONDS FOR 1 REVOLUTION SIZE OF TEST DIAL SECONDS FOR 1 REVOLUTION SIZE OF TEST DIAL 1 cu ft 2 cu ft 5 cu ft 1 cu ft 2 cu ft 5 cu ft...

Страница 15: ...n properly and correct condition e Turn off 115 v power to furnace f Reconnect inducer motor wires replace control door and turn on 115 v power to furnace 4 Check auxiliary limits when used a Turn off...

Страница 16: ...ing popular video based formats and materials All include video and or slides plus companion book Classroom Service Training plus hands on the products in our labs can mean increased confidence that r...

Отзывы: