IV.

HORIZONTAL ATTIC INSTALLATION

WARNING:

Do not install the furnace on its back;

safety control operation will be adversely affected. Never
connect return-air ducts to the sides or back of the
furnace. Failure to follow this warning could result in fire,
personal injury, or death.

The furnace can be installed horizontally on either the left-hand
(LH) or right-hand (RH) side. A typical attic installation is shown
in Fig. 7.

A.

Construct a Working Platform

Construct working platform on location where all required furnace
clearances are met. (See Table 1 and Fig. 7.)

B.

Install Furnace

1. Position furnace in desired location.

2. Connect gas supply pipe. See Fig. 7 for typical piping entry.

3. Install field-supplied filter retainers as indicated in Fig. 8

and Table 4 before connecting return-air duct to furnace.

4. Connect supply- and return-air ducts.

5. Install 24- X 24-in. sheet metal shield on platform in front

of louvered control panel as shown in Fig. 7.

V.

HORIZONTAL CRAWLSPACE INSTALLATION

The furnace can be installed horizontally with either the LH or RH
side up. In a crawlspace, the furnace can either be hung from the
floor joist or installed on suitable blocks or pad. The furnace can
be suspended from each corner by hanger bolts (4 each 3/8-in.
all-thread rod) cut to desired length, 1- X 3/8-in. flat washer,
3/8-in. lockwasher, and 3/8-in. nut. Dimples are provided for hole
locations. (See Fig. 1.)

Since horizontal crawlspace installation is very similar to the attic
installation, refer to section IV. The installation of a sheet metal
shield in front of the louvered control panel is covered in section
IV. For a crawlspace installation, this same sheet metal shield must
be installed above the louvered control panel. Extend the sheet
metal shield over the furnace top far enough to cover the gas pipe
entry hole.

VI.

FILTER ARRANGEMENT

WARNING:

Never operate unit without a filter or with

filter access door removed. Failure to follow this warning
could result in fire, personal injury, or death.

The 2 factory-supplied filters are shipped in the blower compart-
ment. After the return-air duct has been connected to the furnace,
install the filters in a V-formation inside the return-air plenum. See
Fig. 8 and Table 4 for horizontal applications. Horizontal filter
retainers must be field supplied. See Fig. 9 for downflow applica-
tions.

Fig. 7—Typical Attic Installation

A82178

30-IN. MIN
WORK AREA

6

″ 

MIN

FLUE VENT

GAS
ENTRY

24

24

SHEET
METAL

SEDIMENT TRAP

LINE CONTACT ONLY PERMISSIBLE BETWEEN
LINES FORMED BY INTERSECTIONS OF
THE TOP AND TWO SIDES OF THE FURNACE
JACKET AND BUILDING JOISTS,
STUDS, OR FRAMING.

Fig. 6—Furnace, Plenum, and Subbase Installed on a

Combustible Floor

A78651

DOWNFLOW

SUBBASE

SHEET METAL

PLENUM

FURNACE

(OR COIL CASING

WHEN USED)

—6—

Содержание GAS-FIRED INDUCED-COMBUSTION FURNACES 373LAV

Страница 1: ...safety codes In the United States follow all safety codes including the National Fuel Gas Code NFGC NFPA No 54 1992 ANSI Z223 1 1992 In Canada refer to the current edition of the National Standard of...

Страница 2: ...during the procedure These precautions will help to avoid exposing the control to electrostatic discharge by putting the furnace the control and the person at the same electro static potential 1 Disc...

Страница 3: ...n fire electrical shock or other conditions which may cause personal injury loss of life or property damage Consult a qualified installer service agency local gas supplier or your distributor or branc...

Страница 4: ...an equal or greater amount of air is supplied to the room B Confined Space A confined space has volume less than 50 cu ft per 1000 Btuh of the total input ratings of all appliances installed in that...

Страница 5: ...OUTDOORS 1 SQ IN PER 4000 BTUH RETURN AIR VENT THROUGH ROOF CATEGORY I D B A C E 1 SQ IN PER 4000 BTUH DUCT TO OUTDOORS SUPPLY AIR 1 SQ IN PER 2000 BTUH DUCTS TO OUTSIDE 12 MAX 12 MAX CONFINED SPACE 1...

Страница 6: ...red length 1 X 3 8 in flat washer 3 8 in lockwasher and 3 8 in nut Dimples are provided for hole locations See Fig 1 Since horizontal crawlspace installation is very similar to the attic installation...

Страница 7: ...ent trap in the riser leading to the furnace The trap can be installed by connecting a tee to the riser leading from the furnace Connect a capped nipple into the lower end of the tee The capped nipple...

Страница 8: ...nergized with 115v 1 5 amp maximum during blower motor operation 2 Humidifier HUM Quick connect terminal HUM and screw terminal Com are provided for 24 v humidifier connection The terminals are energi...

Страница 9: ...FIELD SUPPLIED FUSED DISCONNECT CONDENSING UNIT TWO WIRE FURNACE R G C W C R G Y GND GND FIELD 24 VOLT WIRING FIELD 115 208 230 460 VOLT WIRING FACTORY 24 VOLT WIRING FACTORY 115 VOLT WIRING 208 230...

Страница 10: ...satisfied R G and R Y circuits are broken Furnace blower and EAC continue operating on cooling speed for an additional 90 sec 3 Continuous blower mode NOTE EAC 1 terminal is energized with 115v whene...

Страница 11: ...ESSURE SWITCH SPST N O TEST TWIN COMPONENT TEST TWIN TERMINAL TRAN TRANSFORMER 115VAC 24VAC JUNCTION UNMARKED TERMINAL PCB TERMINAL FACTORY WIRING 115VAC FACTORY WIRING 24VAC FIELD WIRING 115VAC FIELD...

Страница 12: ...Specific gravity 0 58 Therefore Orifice No 44 Manifold pressure 3 6 in wc The furnace is shipped with No 43 orifices Therefore in this example all main burner orifices must be changed and the manifold...

Страница 13: ...9 3 4 3 7 3 2 40 41 39 3 5 3 8 3 3 40 38 39 3 6 3 2 3 4 40 38 39 3 8 3 3 3 5 38 39 3 4 3 6 38 39 3 4 3 7 890 41 42 3 2 3 6 41 42 3 4 3 7 40 41 3 2 3 5 40 41 3 3 3 6 40 41 39 3 4 3 7 3 2 40 41 39 3 5 3...

Страница 14: ...nd operates if there is a motor failure TABLE 8 GAS RATE CU FT HR SECONDS FOR 1 REVOLUTION SIZE OF TEST DIAL SECONDS FOR 1 REVOLUTION SIZE OF TEST DIAL 1 cu ft 2 cu ft 5 cu ft 1 cu ft 2 cu ft 5 cu ft...

Страница 15: ...n properly and correct condition e Turn off 115 v power to furnace f Reconnect inducer motor wires replace control door and turn on 115 v power to furnace 4 Check auxiliary limits when used a Turn off...

Страница 16: ...ing popular video based formats and materials All include video and or slides plus companion book Classroom Service Training plus hands on the products in our labs can mean increased confidence that r...

Отзывы: