3
The outdoor unit contains the correct amount of refrigerant charge
for operation with AHRI rated and factory--approved smallest
indoor unit when connected by 15 ft (4.57 m) of field--supplied or
factory accessory tubing.
Adjust refrigerant charge by adding or removing the charge
to/from the unit depending on lineset length and indoor unit as
calculated and displayed on the wall control. The wall control
calculates required charge adjustment and total system charge
required. For proper unit operation, check refrigerant charge using
charging information in the Check Charge section of this
instruction.
IMPORTANT:
Liquid--line size is 3/8--in. OD for all 180CNV
applications including long line applications.
IMPORTANT:
Always install the factory--supplied liquid--line
filter drier. Obtain replacement filter driers from your distributor or
branch.
INSTALLATION
IMPORTANT
: Effective January 1, 2015, all split system and
packaged air conditioners must be installed pursuant to applicable
regional efficiency standards issued by the Department of Energy.
Specifications for this unit in residential new construction market
require the outdoor unit, indoor unit (including metering device),
refrigerant tubing sets, and filter drier listed in pre--sale literature.
There can be no deviation. Consult the Service Manual – Air
Conditioners and Air Conditioners Using Puron
Refrigerant to
obtain required unit changes for specific applications and for R--22
retrofit.
Step 1 — Check Equipment and Job Site
Unpack Unit
Move to final location. Remove carton taking care not to damage
unit.
This unit employs one louver spacer on each of the four sides to
prevent louver movement during operation. The louver spacers are
trapped between the coil surface and louver at the approximate
center of each side (See Fig. 2). This louver spacer should be
present and, if dislodged during shipment, must be reinstalled
before unit is placed into operation.
A11380a
Fig. 2 -- Louver Spacer Location
Inspect Equipment
File claim with shipping company prior to installation if shipment
is damaged or incomplete. Locate unit rating plate on unit corner
panel. It contains information needed to properly install unit.
Check rating plate to be sure unit matches job specifications.
Step 2 — Install on a Solid, Level Mounting Pad
If conditions or local codes require the unit be attached to pad, tie
down bolts should be used and fastened through knockouts
provided in unit base pan. Refer to unit mounting pattern in Fig. 3
to determine base pan size and knockout hole location.
For hurricane tie downs, contact distributor for details and PE
(Professional Engineer) Certification, if required.
On rooftop applications, mount on level platform or frame. Place
unit above a load--bearing wall and isolate unit and tubing set from
structure. Arrange supporting members to adequately support unit
and minimize transmission of vibration to building. Consult local
codes governing rooftop applications.
Roof mounted units exposed to winds above 5 mph may require
wind baffles. Consult the Service Manual -- Residential Split
System Air Conditioners and Air Conditioners Using Puron
Refrigerant for wind baffle construction.
NOTE:
Unit must be level to within
2
(
3/8 in./ft,
9.5 mm/m.)
per compressor manufacturer specifications.
CAUTION
!
UNIT OPERATION HAZARD
Failure to follow this caution may result in equipment
damage or improper operation.
Locate the unit in such a way that it is stable in all
circumstances including adverse weather conditions.
Step 3 — Clearance Requirements
When installing, allow sufficient space for airflow clearance,
wiring, refrigerant piping, and service. Allow 24 in. (609.6 mm)
clearance to service end of unit and 48 in. (1219.2 mm) (above
unit. For proper airflow, a 6--in. (152.4 mm) clearance on 1 side of
unit and 12--in. (304.8 mm) on all remaining sides must be
maintained. Maintain a distance of 24 in. (609.6 mm) between
units. Position so water, snow, or ice from roof or eaves cannot fall
directly on unit.
On rooftop applications, locate unit at least 6 in. (152.4 mm) above
roof surface.
3/8---in. (9.53 mm) Dia.
Tiedown Knockouts in
Basepan(2) Places
View From Top
A05177
UNIT BASE PAN
Dimension in. (mm)
TIEDOWN KNOCKOUT LOCATIONS in. (mm)
A
B
C
35 X 35
(889 X 889)
9–1/8 (231.8)
6–9/16 (166.7)
28–7/16 (722.3)
Fig. 3 -- Tiedown Knockout Locations
Содержание 180CNV024
Страница 14: ...14 Table 7 Troubleshooting...