1-51
Confidential
10.
Troubleshooting of the control panel
■
Nothing is displayed on the LCD.
User Check
• Verify if the power switch is turned off.
Step
Cause
Check
Result
Remedy
1
Connection
between main
PCB and control
panel PCB
Are the main PCB and
control panel PCB
connected properly?
No
Reconnect the connector
properly.
2
Connection
between main
PCB and LVPS
PCB unit
Are the main PCB and
LVPS PCB unit
connected properly?
No
Reconnect the connector
properly.
3
LCD
Is the problem solved
after replacing the LCD?
Yes
Replace the LCD.
4
Control panel
PCB
Is the problem solved
after replacing the
control panel PCB?
Yes
Replace the control panel
PCB.
5
LVPS PCB unit
Is the problem solved
after replacing the LVPS
PCB unit?
Yes
Replace the LVPS PCB
unit.
6
Main PCB
Is the problem solved
after replacing the main
PCB ASSY?
Yes
Replace the main PCB
ASSY.
Содержание DCP-7030
Страница 78: ...2 2 Confidential 2 PERIODICAL PEPLACEMENT PARTS There are no parts to be replaced periodically ...
Страница 133: ...3 55 Confidential 8 12 8 ADDRESS LABEL 1 Remove the Address label from the Panel unit Fig 3 53 Address label Panel unit ...
Страница 150: ...3 72 Confidential 8 27 FILTER ASSY 1 Remove the Filter ASSY from the Main body Fig 3 72 Filter ASSY Front side ...
Страница 178: ...3 100 Confidential 8 39 RUBBER FOOT 1 Remove the two Rubber feet from the Main body Fig 3 104 Rubber foot Front side ...
Страница 201: ...5 5 Confidential Print sample Fig 5 1 ...
Страница 226: ...5 30 Confidential Location of fans Fig 5 13 Fan motor 60 unit Right side ...
Страница 233: ...6 1 Confidential CHAPTER 6 CIRCUIT DIAGRAMS WIRING DIAGRAM High voltage Power Supply PCB Circuit Diagram ...
Страница 234: ...6 2 Confidential LVPS PCB Circuit Diagram 100V ...
Страница 235: ...6 3 Confidential LVPS PCB Circuit Diagram 200V ...
Страница 239: ...6 7 Confidential Wiring Diagram ...