background image

GT1000 Series

Installation and Operation Manual

X-VA-GT1000-eng

Part Number: 541B078AAG

April, 2018

ESD (Electrostatic Discharge)

 CAUTION: This instrument contains electronic components that are susceptible to damage by static electricity. Proper handling procedures must be observed

during the removal, installation or other handling of internal circuit boards or devices.

Handling Procedure:

1. Power to unit must be removed.

2. Personnel must be grounded, via a wrist strap or other safe, suitable means before any printed circuit card or other internal device is installed,

removed or adjusted.

3. Printed circuit cards must be transported in a conductive container. Boards must not be removed from protective enclosure until immediately before

installation. Removed boards must immediately be placed in protective container for transport, storage or return to factory.

Comments

This instrument is not unique in its content of ESD (electrostatic discharge) sensitive components. Most modern electronic designs contain components

that utilize metal oxide technology (NMOS, SMOS, etc.). Experience has proven that even small amounts of static electricity can damage or destroy these

devices. Damaged components, even though they appear to function properly, exhibit early failure.

Brooks Instrument designs, manufactures and tests its products to meet many national and international standards. These products must be properly

installed, operated and maintained to ensure they continue to operate within their normal specifications. The following instructions must be adhered to

and integrated into your safety program when installing, operating and maintaining Brooks Instrument products.

To ensure proper performance, use qualified personnel to install, operate, update, program and maintain the product.

Read all instructions prior to installing, operating and servicing the product. If this instruction manual is not the correct manual, please see back cover

for local sales office contact information. Save this instruction manual for future reference.

 WARNING: Do not operate this instrument in excess of the specifications listed in the Instruction and Operation Manual. Failure to heed

this warning can result in serious personal injury and / or damage to the equipment.

If you do not understand any of the instructions, contact your Brooks Instrument representative for clarification.

Follow all warnings, cautions and instructions marked on and supplied with the product.

 WARNING: Prior to installation ensure this instrument has the required approval ratings to meet local and national codes. Failure to heed this warning can

result in serious personal injury and / or damage to the equipment.

Install your equipment as specified in the installation instructions of the appropriate instruction manual and per applicable local and national codes.

Connect all products to the proper electrical and pressure sources.

Operation: (1) Slowly initiate flow into the system. Open process valves slowly to avoid flow surges. (2) Check for leaks around the flow meter inlet

and outlet connections. If no leaks are present, bring the system up to the operating pressure.

Please make sure that the process line pressure is removed prior to service. When replacement parts are required, ensure that qualified people use

replacement parts specified by Brooks Instrument. Unauthorized parts and procedures can affect the product's performance and place the safe

operation of your process at risk. Look-alike substitutions may result in fire, electrical hazards or improper operation.

Ensure that all equipment doors are closed and protective covers are in place to prevent electrical shock and personal injury, except when

maintenance is being performed by qualified persons.

 WARNING: For liquid flow devices, if the inlet and outlet valves adjacent to the devices are to be closed for any reason, the devices must be completely

drained. Failure to do so may result in thermal expansion of the liquid that can rupture the device and may cause personal injury.

All pressure equipment with an internal pressure greater than 0.5 bar (g) and a size larger than 25mm or 1" (inch) falls under the Pressure Equipment Directive (PED).

The Specifications Section of this manual contains instructions related to the PED directive.

Products described in this manual are in compliance with EN directive 2014/34/EU.

All Brooks Instrument Flowmeters fall under fluid group 1.

Products larger than 25mm or 1" (inch) are in compliance with PED category I, II or III.

Products of 25mm or 1" (inch) or smaller are Sound Engineering Practice (SEP).

The Brooks Instrument (electric/electronic) equipment bearing the CE mark has been successfully tested to the regulations of the Electro Magnetic

Compatibility (EMC directive 2014/30/EU).

Special attention however is required when selecting the signal cable to be used with CE marked equipment.

Quality of the signal cable, cable glands and connectors:

Brooks Instrument supplies high quality cable(s) which meets the specifications for CE certification.

If you provide your own signal cable you should use a cable which is overall completely screened with a 100% shield.

“D” or “Circular” type connectors used should be shielded with a metal shield. If applicable, metal cable glands must be used providing cable screen clamping.

The cable screen should be connected to the metal shell or gland and shielded at both ends over 360 Degrees.

The shield should be terminated to an earth ground.

Card Edge Connectors are standard non-metallic. The cables used must be screened with 100% shield to comply with CE certification.

The shield should be terminated to an earth ground.

For pin configuration : Please refer to the enclosed Instruction Manual.

European Pressure Equipment Directive (PED)

European Electromagnetic Compatibility (EMC)

Essential  Instructions

Read before proceeding!

Содержание GT1000 Series

Страница 1: ...Installation and Operation Manual X VA GT1000 eng Part Number 541B078AAG April 2018 GT1000 Series Brooks GT1000 Industrial Glass Tube Variable Area Flowmeter Model GT1020 Model GT1024...

Страница 2: ...national codes Connect all products to the proper electrical and pressure sources Operation 1 Slowly initiate flow into the system Open process valves slowly to avoid flow surges 2 Check for leaks ar...

Страница 3: ...operate above pressure and temperature limits Avoid pressure and flow surges Do not service or repair while pressurized Read and understand instruction manual Failure to comply could result in seriou...

Страница 4: ...emicals to medical devices analytical instrumentation semiconductor manufacturing and more The Brooks product you have just received is of the highest quality available offering superior performance r...

Страница 5: ...ction 2 Installation 2 1 General 13 2 2 Receipt of Equipment 13 2 3 Recommended Storage Practice 13 2 4 Return Shipment 13 2 5 Transit Precautions 14 2 6 Installation 14 Section 3 Operation 3 1 Pre Op...

Страница 6: ...ical Flowmeter Piping Configuration 15 2 2 Drill Template for Panel Mounting Full Scale for Meters Sizes 7 8 9 10 Consult Factory for Meters Sizes 2 6 12 13 16 3 1 Typical Flowmeter Piping Configurati...

Страница 7: ...smallest areas of the tube Refer to Figure 1 1 As the float moves up and down within the tapered tube the annular area between the float and tube varies area increases as the float rises This gives t...

Страница 8: ...Manual X VA GT1000 eng Part Number 541B078AAG April 2018 Section 1 Introduction 2 Figure 1 2 Cross Section GT1000 Flow Tubes with Rib Guides Figure 1 3 GT1000 Floats Descriptions refer to floats used...

Страница 9: ...meter or percentage of maximum flow with factor tag Ambient Temperature Limits 33 to 125 F 1 C to 52 C Operating Fluid Temperature Limits Maximum 250 F 121 C Meter Minimum 33 F 1 C Operating Fluid Tem...

Страница 10: ...process fluid p o r D e r u s s e r P p o r D e r u s s e r P Flow Rate Water Air Flow Rate Pressure Drop V I C Flow Rate Pressure Drop REQ REQ TUBE FLOAT GPM l h INCHES W C kPa cSt SCFM m3n h INCHES...

Страница 11: ...6 2 1400 11 2 8 15 25 40 13 3 3 0 0 R 10M 25 3FT 10 XS 138 10 2400 30 7 5 5 5 45 75 36 9 0 30 2 Size 12 12 XV 221 17 3900 10 2 5 29 70 110 12 3 0 0 0 R 12M 20 5FT 12 XV 343 20 4700 16 4 0 36 94 150 18...

Страница 12: ...d reed switch which is insulated to prevent damage from mild shock and normal pipe vibration The contact rating of the switch is very low 0 5A An external relay is recommended for secure operation Plu...

Страница 13: ...plosive Atmospheres ATEX the reed switches are therefore outside the scope this Directive and does not have a Declaration of Conformity or CE mark related to this Directive When used as Simple Apparat...

Страница 14: ...nstallation and Operation Manual X VA GT1000 eng Part Number 541B078AAG April 2018 Section 1 Introduction 8 Figure 1 4 GT1000 Family NPT Flanged and w Alarm Options NPT Connections Flanged Connections...

Страница 15: ...rrent circuit Please refer to Table 1 6 Table 1 6 Data 10 15 14 N3 Inductive Coils Single or Dual for Meter Sizes 2 and 6 Intrinsically Safe Division 1 Class I Groups A B C D Class II Groups E F G Cla...

Страница 16: ...GT1000 Series Installation and Operation Manual X VA GT1000 eng Part Number 541B078AAG April 2018 Section 1 Introduction 10 Figure 1 5 Alarm Switch es for GT1000 Sizes 7 13...

Страница 17: ...Installation and Operation Manual X VA GT1000 eng Part Number 541B078AAG April 2018 GT1000 Series Section 1 Introduction 11 Figure 1 6 Dimensions and Specs Intrinsically Safe Switch Isolators...

Страница 18: ...00 eng Part Number 541B078AAG April 2018 Section 1 Introduction 12 Figure 1 7 Alarm Wiring Diagram Reed Switch Inductive Alarm with Agency Approved Power Supply Relay Isolator and Alarm Wiring Diagram...

Страница 19: ...not discarded with the packing materials Inspect for damaged or missing parts 2 3 Recommended Storage Practice If intermediate or long term storage of equipment is required it is recommended that the...

Страница 20: ...h end fitting at the rear of the meter Additionally the various end fittings offer horizontal or vertical connections or a combination of both C Panel Mounting panel mount option specified on order If...

Страница 21: ...he lower end fitting 9 Push the plastic tube retainer all the way into hold the tube in position Note Before installing the front shield you may wish to clean the inside surface with a commercial glas...

Страница 22: ...eration Manual X VA GT1000 eng Part Number 541B078AAG April 2018 Section 2 Intallation 16 Figure 2 2 Drill Template for Front Panel Mounting for Meters Sizes 7 8 9 10 Consult Factory for Meters Sizes...

Страница 23: ...ings and their clamps Align horizontal end fittings with the piping before tightening the clamp bolts to 95 inch pounds 10 7 Newton Meter 7 Bolt the meter to the panel using four 1 4 20 or M6 bolts of...

Страница 24: ...GT1000 Series Installation and Operation Manual X VA GT1000 eng Part Number 541B078AAG April 2018 Section 2 Intallation 18 THIS PAGE WAS INTENTIONALLY LEFT BLANK...

Страница 25: ...n the scale the flowmeter is ready for operation If the reference lines are not aligned loosen the screws securing the scale and move it until the marks are in alignment Then tighten the screws 3 2 Op...

Страница 26: ...OWMETER To initiate flow through a flowmeter using bypass piping refer to Figure 3 1 1 Close flowmeter inlet valve A and outlet valve B 2 Fully open bypass valve C and slightly open control valve D 3...

Страница 27: ...Installation and Operation Manual X VA GT1000 eng Part Number 541B078AAG April 2018 GT1000 Series Section 4 Maintenance 21 4 1 Overview...

Страница 28: ...t float stop from the metering tube 5 Clean the metering tube float stops float and end fittings with a suitable solvent 6 Install the inlet float stop into the metering tube Refer to Figure 1 3 for t...

Страница 29: ...g Part Number 541B078AAG April 2018 GT1000 Series Section 5 Parts Assembly 23 5 1 General See Figures 5 1 through 5 3 and Table 5 1 for parts assembly drawings and parts list Figure 5 1 GT1000 Sizes 2...

Страница 30: ...GT1000 Series Installation and Operation Manual X VA GT1000 eng Part Number 541B078AAG April 2018 Section 5 Parts Assembly 24 Figure 5 2 GT1000 Sizes 7 10 Parts Assembly Drawing...

Страница 31: ...Installation and Operation Manual X VA GT1000 eng Part Number 541B078AAG April 2018 GT1000 Series Section 5 Parts Assembly 25 Figure 5 3 GT1000 Sizes 12 and 13 Parts Assembly Drawing Ref MR 1020 Z 028...

Страница 32: ...UTLET FLOAT STOP 21 OUTLET FLOAT STOP RETAINER 22 TUBE SEAT GASKET 25 SCALE BRACKET 26 LOCK WASHER SCL BRKT TO HSG 27 SCREW SCALE BRKT TO HOUSING 28 RIGHT SIDE DET SCALE 29 LEFT SIDE DET SCALE 30 SCRE...

Страница 33: ...ons 27 Brooks Instrument Brooks Instrument x x x Brooks Instrument x x x 1 2 x Brooks Instrument x PED 0 5 bar g 25 mm 1 inch PED x PED x 2014 34 EU x Brooks Instrument 1 x 25 mm 1 inch I II III PED x...

Страница 34: ...n vypr zdnit Pokud tak neu in te m e z d vodu teplotn rozta nosti zbytk m dia v za zen doj t k jeho po kozen nebo k ohro en zdrav osob Evropsk sm rnice pro tlakov za zen PED Na ve ker tlakov za zen s...

Страница 35: ...ukket p samme tid i forbindelse med aftapning S fremt dette ikke overholdes er der risiko for at v sken p grund af varmeudvikling ekspanderer og dette kan for rsage skade p udstyr og personer Det Euro...

Страница 36: ...rdt nagelaten kan dit leiden tot thermische expansie van de vloeistof waardoor het apparaat kan barsten en lichamelijk letsel kan veroorzaken PED Pressure Equipment Directive Alle drukapparatuur met e...

Страница 37: ...ib vedelik soojuse m jul paisuda niiv rd et seade puruneb See v ib p hjustada raskeid kehavigastusi Euroopa surveseadmete direktiiv PED Euroopa surveseadmete direktiiv kohaldub k ikidele surveseadmete...

Страница 38: ...l mp laajenemista joka saattaa johtaa laitteen rikkoutumiseen ja henkil vahingon vaaraan Eurooppalainen painelaitedirektiivi PED Painelaitteet joiden paine on suurempi kuin 0 5 bar g ja joiden koko on...

Страница 39: ...n est pas fait une ventuelle dilatation thermique du fluide peut casser l appareil et provoquer des blessures Directive europ enne quipements sous pression PED Tous les quipements sous pression dont l...

Страница 40: ...eert werden anderenfalls kann es zu einer thermischen Ausdehnung der Fl ssigkeit und damit zum Bruch des Ger tes kommen Personensch den k nnen die Folge sein Europ ische Druckger terichtlinie PED Alle...

Страница 41: ...l Instructions 35 Greek Brooks Instrument Brooks Instrument x x x Brooks Instrument x x x 1 2 x Brooks Instrument x PED 0 5 bar g 25 mm 1 PED x PED x 2014 34 EU x Brooks Instrument 1 x 25 mm 1 PED x 2...

Страница 42: ...a berendez st teljesen le kell r teni Ennek elmulaszt sa a folyad k h t gul s t okozhatja ami k ros thatja a berendez st s szem lyi s r l shez vezethet Nyom start berendez sekre vonatkoz eur pai ir n...

Страница 43: ...ompletamente l apparecchiatura L inosservanza pu causare la dilatazione termica del liquido che pu danneggiare l apparecchiatura e provocare lesioni alle persone Direttiva europea relativa alle appare...

Страница 44: ...um eso os iepl des un izpl des v rstus k da iemesla d ir j aizver no ier c m ir j izlai viss idrums Pret j gad jum idrums var termiski izplesties p rraut ier ci un rad t traumas Eiropas spiedieniek rt...

Страница 45: ...nio reikia i leisti vis skyst To nepadarius galimas iluminis skys io pl timasis galintis sugadinti rengin ir su eisti mon s Europos sl gin s rangos direktyva PED Visa sl gin ranga kurios vidinis sl gi...

Страница 46: ...e si na nich zawory wej ciowe i wyj ciowe maj by z jakiego powodu zamkni te to urz dzenie musi zosta ca kowicie opr nione z ciek ego medium Niedope nienie tego zalecenia mo e doprowadzi do termicznego...

Страница 47: ...a montante e jusante do equipamento tenha em aten o que o mesmo dever ser previamente esvaziado do flu do que o atravessa Esta obriga o surge do facto de existir a possibilidade de ocorrer dilata o t...

Страница 48: ...are i ie ire limitrofe instala iei instala ia trebuie complet golit Neglijarea acestui lucru poate avea ca efect dilatarea termic a fluidului care poate defecta instala ia i poate produce r niri de pe...

Страница 49: ...n uzavrie vstupn a v stupn ventily zariadenie je potrebn plne vypr zdni Zanedbanie vyp ania m za n sledok po kodenie zariadenia s mo nos ou zranenia obsluhy z d vodu tepelnej roz a nosti n plne Eur ps...

Страница 50: ...tega ne naredite lahko pride do toplotnega raztezanja teko ine zaradi katerega se lahko naprava prelomi in povrzo i telesne po kodbe Evropska direktiva o tla ni opreni PED Vsa tla na oprema z notranji...

Страница 51: ...instalaciones deber n ser completamente vaciadas La omisi n de esto ltimo puede provocar la dilataci n t rmica del l quido lo que puede da ar al equipo y conducir a da os personales Directriz Europea...

Страница 52: ...orsaka personliga skador European Pressure Equipment Directive PED R dets Direktiv 99 36 EG av den 29 april 1999 1 om transportabla tryckb rande anordningar Alla utrustning f r tryck med ett tryck ve...

Страница 53: ...Installation and Operation Manual X VA GT1000 eng Part Number 541B078AAG April 2018 GT1000 Series THIS PAGE WAS INTENTIONALLY LEFT BLANK...

Страница 54: ...t International Standards Visit www BrooksInstrument com to locate the service location nearest to you START UP SERVICE AND IN SITU CALIBRATION Brooks Instrument can provide start up service prior to...

Отзывы: