TWO-PART LINE REEVING
When resting the downhaul or sheave block on the ground for changing it, use the
following procedure to prevent fouling the load line on the hoist. Raise the boom about 5
feet (1.52 m) and lower the hoist until the hook nearly touches the ground. Then lay the
hook on the ground by lowering the boom, not the hoist.
Содержание IC-35-2F
Страница 7: ...1 2 DIMENSIONS AND ORIENTATION IC 35 2F Courtesy of Crane Market...
Страница 8: ...1 3 TURNING DIMENSIONS Courtesy of Crane Market...
Страница 17: ...Courtesy of Crane Market...
Страница 29: ...2 12 CRANE CAPACITY CHART FOR IC 35 2F Courtesy of Crane Market...
Страница 30: ...2 12M CRANE CAPACITY CHART FOR IC 35 2F METRIC Courtesy of Crane Market...
Страница 31: ...Courtesy of Crane Market...
Страница 39: ...Courtesy of Crane Market...
Страница 47: ...3 8 IC 35 LUBRICATION CHART Courtesy of Crane Market...
Страница 51: ...3 12 JIC SCHEMATIC Courtesy of Crane Market...
Страница 52: ...3 12M JIC SCHEMATIC METRIC Courtesy of Crane Market...
Страница 53: ...Courtesy of Crane Market...
Страница 55: ...3 14 STEERING SYSTEM Courtesy of Crane Market...
Страница 57: ...3 16 IC 35 PROPULSION SYSTEM Courtesy of Crane Market...
Страница 71: ...Powered by TCPDF www tcpdf org Courtesy of Crane Market...