18
Frame
Stroke of front brake
handle
10-20mm
Stroke of rear brake
pedal
10-20mm
Pneumatic pressure unit
of tire: Kpa
BX125
Front
wheel
spec.
100/90-18
Front wheel
pneumatic
pressure
225kpa
Rear
wheel
spec.
120/80-17
Rear wheel
pneumatic
pressure
225kpa
Torque
Front wheel
shaft nut
75-85 N·m
Rear wheel shaft nut
75-85 N·m
Periodic maintenance schedule form
Mileage and
interval
Items
300
KM
1000
KM
4000
KM
8000
KM
12000
KM
16000
KM
Tools
New
Vehicle
One
month
three
months
Six
months
Twelve
months
Fifteen
months
*
Air cleaner
I
C
C
R
C
Common tool
*
Gasoline filter
I
C
C
R
C
Common tool
*
Engine oil filter
C
C
C
C
C
C
Common tool
Engine oil replacement
R
Every 5000KM: R
Common tool
Tire pressure
I
I
I
I
I
I
Tire gauge, air
inflator
Battery inspection
I
I
I
I
I
I
Densimeter,
multimeter
Actuating stroke
inspection
I
I
I
I
I
I
Common tool
Inspection of steering
handle bar looseness
I
I
I
I
Common tool
Shock absorber
actuating inspection
I
I
I
I
Common tool
Inspection of looseness
of bolts at all positions
I
I
I
I
I
I
Torque wrench
Check leakage of
gearbox
I
I
I
I
I
I
Common tool
*
Spark plug inspection
and replacement
I
I
R
I
I
Common tool
*
Replacement of
I
Every 5000KM: R
Common tool
KS MOTORCYCLES - http://ksmotorcycles.com
Содержание BX125
Страница 1: ...0 Model BX125 Motorcycle Service Manual ROHENTWURF DRAFT KS MOTORCYCLES http ksmotorcycles com ...
Страница 10: ...9 BX125 KS MOTORCYCLES http ksmotorcycles com ...
Страница 57: ...56 Maintain the chain looseness within the specified limits KS MOTORCYCLES http ksmotorcycles com ...
Страница 58: ...57 Inspection and Maintenance of Electrical System Charging system KS MOTORCYCLES http ksmotorcycles com ...
Страница 125: ... 124 KS MOTORCYCLES http ksmotorcycles com ...
Страница 129: ... 128 14 2 1 4 Circuit diagram of electronic fuel injection KS MOTORCYCLES http ksmotorcycles com ...
Страница 148: ... 147 BX125 Circuit Diagram ...