Brew-Boss® V2.06 Operation Manual
Assembly
The Hops-Boss is assembled easily with 8 nuts. Items are assembled as shown in the picture below.
If you have the optional heat shield, Make certain to mount the Chute to the Baseplate first, as the heat
shield (not shown) will obstruct the fasteners on the bottom of the Baseplate, making them difficult to
install. Don't over-tighten the nuts! Just a small amount of torque once the nut makes contact is
sufficient.
The Carrier Gear and the Hops Cups (Mortar Shells) are shipped installed. To remove the top gear,
simply unscrew the center socket head bolt and remove the gear and mortar shells. The shells are
loosely retained by the carrier gear, so be
careful not to drop any of the mortar shells.
They are purposely designed to fit loosely so
they ride flush with the baseplate when
moving. We have found it easiest to hold the
Hops-Boss assembly as shown when
removing or installing the top gear as the
mortar shells will stay in place in this
position.
Page 71