PELLET VENT TYPE

A UL listed 4-inch or 6-inch type “PL” pellet vent exhaust system may be used for installation and attached to the pipe connector 

provided on the stove.  Connection at stove must be sealed using Hi-Temp RTV.  Use 6-inch vent if the vent height is over 12-feet 
or if the installation is over 2,500 feet above sea level.

We recommend the use of Simpson Dura-Vent® or Metal-Fab® pipe (if you use other pipe, consult your local building codes 

and/or building inspectors).  Do not use Type-B Gas Vent pipe or galvanized pipe with this unit. The pellet vent pipe is designed to 
disassemble for cleaning and should be checked several times during the burning season. Pellet vent pipe is not furnished with the 
unit and must be purchased separately.

PELLET VENT INSTALLATION

The installation must include a clean-out tee to enable collection of 

fl

 y ash and to permit periodic cleaning of the exhaust system.  

90-degree elbows accumulate 

fl

 y ash and soot, thereby reducing exhaust 

fl

 ow and performance of the stove.  Each elbow or tee 

reduces draft potential by 30% to 50%.

All joints in the vent system must be fastened by at least 3 screws, and all joints must be sealed with Hi-Temp RTV silicone sealant 

to be airtight.  The area where the vent pipe penetrates to the exterior of the home must be sealed with silicone or other means to 
maintain the vapor barrier between the exterior and the interior of the home.

Vent surfaces can get hot enough to cause burns if touched. Noncombustible shielding or guards may be required.

PELLET VENT TERMINATION

Do not terminate the vent in an enclosed or semi-enclosed area, such as. carport, garage, attic, crawl space, under a sundeck or 

porch, narrow walkway, or any other location that can build up a concentration of fumes.  Termination in one of these areas can also 
lead to unpredictable pressure situations with the appliance; and could result in improper performance and/or malfunction.

The termination must exhaust above the outside air inlet elevation.   
The termination must not be located where it will become plugged by snow or other materials.

DO NOT CONNECT THIS UNIT TO A CHIMNEY FLUE SERVING ANOTHER APPLIANCE.

The following recommendations may be useful for the installation of your chimney:
• 

It must rise above the roof at least 3’ (0.9m) from the uppermost point of contact.

• 

The exterior portion should be double or triple wall pipe to ensure proper draft.

• 

The chimney must exceed any part of the building or other obstruction within a 10’ (3.04m) distance by a height of 2’ (0.6m).

• 

Installation of an interior chimney is always preferable to an exterior chimney.  The interior chimney will be hotter than an 
exterior chimney that is being cooled by the ambient air outside the house. Therefore the gas which circulates will cool slower, 
thus reducing the build-up of creosote and the risk of chimney 

fi

 res.

• 

The draft caused by the tendency for hot air to rise will be increased with an interior chimney.

• Using 

fi

 re screen at the extremity of the chimney requires regular inspection in order to insure that it is not obstructed thus 

blocking the draft, and it should be cleaned when used regularly. 

TYPE HT CHIMNEY

Your wood stove may be hooked up with a factory built or masonry chimney. If you are using a factory built chimney, it must 

comply with UL 103 or CSA-B365 standard; therefore it must be a Type HT (2100°F). It is extremely important that it be installed 
according to the manufacturer’s speci

fi

 cations.

If you are using a masonry chimney, it is important that it be built in compliance with the speci

fi

 cations of the National Building 

Code. It must be lined with 

fi

 re clay bricks, metal or clay tiles sealed together with 

fi

 re cement. (Round 

fl

 ues are the most ef

fi

 cient).

The interior diameter of the chimney 

fl

 ue must be 4”-6”.  A 

fl

 ue which is too small may cause draft problems, while a large 

fl

 ue 

favors rapid cooling of the gas, and hence the build-up of creosote and the risk of chimney 

fi

 res. Note that it is the chimney and not 

the stove which creates the draft effect; your stove’s performance is directly dependent on an adequate draft from your chimney.

Содержание SPC50

Страница 1: ...available for download from the Breckwell website http www Breckwell com La version française est disponible pour téléchargement à partir du site Breckwell http www breckwell com MODEL SPC50 OWNER S OPERATION AND INSTALLATION MANUAL Part No 852202 Rev A Breckwell 227 Industrial Park Rd P O Box 151 South Pittsburg TN 37380 Phone 866 606 8444 or 800 750 2723 www Breckwell com This unit is not intend...

Страница 2: ...ng door open A safety concern may arise from sparks or fumes entering the room Allow the stove to cool before performing any maintenance or cleaning Ashes must be disposed in a metal container with a tight fitting lid The closed container of ashes should be placed on a non combustible surface or on the ground well away from all combustible materials pending final disposal The exhaust system should...

Страница 3: ...result in reduced performance and excessive cleaning requirements of your appliance and flue Store your pellets in a dry place DO NOT store the fuel within the installation clearances of the unit or within the space required for refueling and ash removal Doing so could result in a house fire Do not overfire or use volatile fuels or combustibles Doing so may cause personal and property damage hazar...

Страница 4: ...TOVE INSTALLATION A stove must never be installed in a hallway or near a staircase since it may block the way in case of fire or fail to respect required clearances It is of the utmost importance that the clearances to combustible materials be strictly adhered to during installation of the stove Refer to the table and diagrams below for minimum required clearances Any reduction in clearance to com...

Страница 5: ...y detailed installation requirements mobile home installations must meet the following requirements 1 The heater must be permanently attached to the floor 2 The heater must be electrically grounded to the steel chassis of the mobile home with 8 GA copper wire using a serrated or star washer to penetrate paint or protective coating to ensure grounding 3 When moving your mobile home all exterior ven...

Страница 6: ... out when opened or back drafts occur whether or not there is combustion present 3 Opening a window slightly on a calm windless day alleviates any of the above symptoms 4 The house is equipped with a well sealed vapor barrier and tight fitting windows and or has any powered devices that exhaust house air 5 There is excessive condensation on windows in the winter 6 A ventilation system is installed...

Страница 7: ...ion toward the chimney Any installation with a horizontal run of stove pipe must conform to NFPA 211 You may contact NFPA National Fire Protection Association and request the latest edition of the NFPA Standard 211 To insure a good draft the total length of the stove pipe should never exceed 8 to 10 2 4m to 3 04 m Except for cases of vertical installation cathedral roof style where the smoke exhau...

Страница 8: ...aust above the outside air inlet elevation The termination must not be located where it will become plugged by snow or other materials DO NOT CONNECT THIS UNIT TO A CHIMNEY FLUE SERVING ANOTHER APPLIANCE The following recommendations may be useful for the installation of your chimney It must rise above the roof at least 3 0 9m from the uppermost point of contact The exterior portion should be doub...

Страница 9: ...y a professional Make sure there are no cracks loose mortar or other signs of deterioration and blockage Have the chimney cleaned before the stove is installed and operated When connecting the stove through a combustible wall to a masonry chimney special methods are needed as explained in the Combustible Wall Chimney Connector Pass Throughs Section ...

Страница 10: ...ector and a minimum 24 gauge ventilated wall thimble which has two air channels of 1 25 4 mm each construct a wall pass through There shall be a minimum 6 152 4 mm separation area containing fiberglass insulation from the outer surface of the wall thimble to wall combustibles Support the wall thimble and cover its opening with a 24 gauge minimum sheet metal support Maintain the 6 152 4 mm space Th...

Страница 11: ...same manufacturer and install the ceiling support package or wall pass through and T section package firestops where needed insulation shield roof flashing chimney cap etc Maintain proper clearance to the structure as recommended by the manufacturer The chimney must be the required height above the roof or other obstructions for safety and proper draft operation ...

Страница 12: ... heat the heat level will go to the level that you set on the controller It is recommended that you set the heat level to slightly above what is needed When the thermostat is satisfied then the stove will return to idle until heat is called for again TO ADJUST THE THERMOSTAT IDLE HEAT LEVEL 1 When the stove is in run mode scroll through the main menu until you see set idle heat level 2 Press enter...

Страница 13: ...llet PRE START UP CHECK Clean the firebox Clean door glass if necessary a dry cloth or paper towel is usually sufficient Never use abrasive cleaners on the glass or door Check fuel in the hopper and refill if necessary It is recommended that you preform a system sensor check prior to initial and seasonal start up see trouble shooting BUILDING A FIRE Never use a grate or other means of supporting t...

Страница 14: ... out REFUELING The hopper and stove top will be hot during operation therefore you should always use some type of hand protection when refueling your stove Never place your hand near the auger while the stove is in operation We recommend that you not let the hopper drop below full KEEP HOPPER LID CLOSED AT ALL TIMES EXCEPT WHEN REFILLING DO NOT OVERFILL HOPPER SHUTDOWN PROCEDURE If you must shutdo...

Страница 15: ...qualified chimney sweep can perform this service It is also recommended that before each heating season the entire system be professionally inspected cleaned and if necessary repaired To clean the chimney disconnect the vent from the stove Establish a routine for the fuel wood burner and firing technique Check daily for creosote build up until experience shows how often you need to clean to be saf...

Страница 16: ...controls on and make sure that they are working properly This is also a good time to give the entire stove a good cleaning throughout SPRING SHUTDOWN After the last burn in the spring remove any remaining pellets from the hopper and the auger feed system Scoop out the pellets and then run the auger until the hopper is empty and pellets stop flowing this can be done by pressing the ON button with t...

Страница 17: ...UBLE SHOOTING GUIDE SYSTEM SENSOR CHECK PROCEDURE To preform a system sensor check the stove must be plugged in cool and off 1 Turn the stove on After a few seconds the controller will ask a series of questions Answer the questions as shown to proceed with the system check 2 Q1 Is there a fire in the burnpot A1 No press the left or down arrow key 3 Q2 Do you want to start a fire A2 No press the le...

Страница 18: ...ent characteristics when being burned AUGER Auger jam Start by emptying the hopper Then remove the auger motor remove the auger shaft inspection plate in the hopper so that you can see the auger shaft After you have removed the shaft inspect it for bent flights burrs or broken welds Remove any foreign material that might have caused the jam Also check the auger tube for signs of damage such as bur...

Страница 19: ...rent going to the fuel sensor thermodisc after the stove has been on for 10 minutes The proof of fire Fuel sensor thermodisc has came upluged Check the Fuel sensor thermodisc to see if the wires are connected properly The proof of fire Fuel sensor thermodisc has malfunctioned TemporarilybypasstheFuelsensorthermodiscbydisconnecting the two wires and connecting them with a short piece of wire Then p...

Страница 20: ... or vent pipe is dirty which restricts airflow through the burnpot Follow all cleaning procedure in the maintenance section of the owner s manual COMBUSTION AIR The air inlet or the interior chambers have a partial blockage Follow all cleaning procedures in the maintenance section of the owner s manual Blockage in air intake pipe Visually inspect the air intake pipe that leads into the burnpot for...

Страница 21: ...ot sending power to combustion blower If there is no current going to the combustion blower check all wire connections If all wires are properly connected you have a bad control board 9 Air switch has failed To test the air switch you will need to disconnect the air hose from the body of the stove With the other end still attached to the air switch very gently blow on the loose end of the hose you...

Страница 22: ...ger Body 1 892322 Auger 1 892320 Auger Bushing Bearing Assembly 1 40602 Baffles 2 892314 Primary Secondary Air Tube Assembly 1 892315 Tube Weldment 1 892316 Primary Air Bushing 1 892317 Primary Air Nozzle 1 892318 Air Shutter Assembly 1 892313 Touchup Paint Specify Color 1 80664 4 Fan 2 80665 Electromagnet 12 Volt 1 80491 Microswitch 1 80661 Pressure Switch 1 80663 Hopper Thermodisc 1 80462 Recept...

Страница 23: ...23 WIRING DIAGRAM J8 ...

Страница 24: ...24 NOTES ...

Страница 25: ...25 NOTES ...

Страница 26: ...eplate attached to the heater When ordering repair parts always give the following information as shown in this list HOW TO ORDER REPAIR PARTS 1 The part number 2 The part description 3 The model number ________________________________________ 4 The serial number _________________________________________ Breckwell 227 Industrial Park Rd P O Box 151 South Pittsburg TN 37380 Phone 866 606 8444 www B...

Страница 27: ..._______ Reason for Purchase Alternative Heat Main Heat Source Decoration Cost Other _________________________ What was the determining factor for purchasing your new appliance _______ I have read the owner s manual that accompanies this unit and fully understand the Installation Operation and Maintenance of my new appliance Print Name Signature Date Please attach a copy of your purchase receipt Wa...

Страница 28: ...28 CUT HERE CUT HERE Fold Here Fold Here Fold Here PLACE STAMP HERE Breckwell 227 Industrial Park Rd P O Box 151 South Pittsburg TN 37380 USA ...

Отзывы: