56
Assembly Instructions
Step 18 – Install Log Cradles
Insert (2) bolts in lower holes in the beam and install (2) nuts on bolts
leaving them loose enough to install the cradles.
Slide log cradles onto bolts as shown below (with flanges pointed
toward the hitch end of the splitter).
Install upper (2) bolts and (2) nuts and tighten.
Torque to 21 ft.-lb.
Tools Needed
Ratchet
Torque Wrench
13mm Socket
13mm Wrench
Fasteners Needed from Parts Bag:
Part # 82561
M8-1.25 x 25mm
Qty: 4
Part # 82281
M8-1.25 Nut
Qty: 4
Note orientation of log cradle mounts
Содержание VH1724GC
Страница 2: ...2 Hazard Signal Word Definitions ...
Страница 30: ...30 Parts Breakdown Exploded View Rev A ...
Страница 59: ...59 This page is intentionally left blank ...
Страница 62: ...62 20195 S Diamond Lake Rd Ste 100 Rogers MN 55374 1 800 350 8739 ...