Commissioning log
Section 2 • Page 5-1
Section 2 – Operating Instructions
Rev. 6.4 dated 2022-02
Software Released Version: 1
(Eco)RO Dia II
Section 2 • Chapter 5
5.
Commissioning log
After the system has been commissioned, the following commissioning log is to be completed and signed by the
persons involved.
5.1
System parameters
The set system parameters are to be found in the commissioning log.
CAUTION
At the time when the system is handed over, the pre-treatment unit and the reverse osmosis
system are to be connected to the municipal drinking water network in accordance with
legislation and local regulations.
CAUTION
If the plant and equipment are moved to another location, the operator is obliged to install
the entire system in compliance with the legal and local regulations applicable at the new
site.