background image

Page 30

Maintenance and Lubrication

WA

RNING

Maintenance and 

lubrication procedures 

must be performed as 

specified by an 

authorized service 

technician.  Failure to 

do so may result in 

serious bodily injury 

and/or property 

damage.

Proper maintenance is necessary to ensure safe, 

trouble-free lift operation.  Inspecting the lift for 

any wear, damage or other abnormal conditions 

should be a part of the transit agency daily service 

program.  Simple inspections can detect potential 

problems. 

Park vehicle on a level surface clear of traffic and 

bystanders.  Place vehicle transmission in “Park” 

and engage parking brake.  Deploy lift to ground 

level.  Provide adequate work space around fully-

deployed lift.  Perform specified maintenance and 

lubrication procedures (position lift as required). 

Pump Module:  When cleaning the exterior of 

the pump module, first disconnect the unit from 

its power source.  Do not use liquid cleaners, 

aerosols, abrasive pads, scouring powders or 

solvents, such as benzine or alcohol.  Use a 

soft cloth lightly moistened with a mild detergent 

solution.  Ensure the surface cleaned is fully dry 

before reconnecting power.  

Other Components:  Clean components and 

the surrounding area before applying lubricants.  

Clean only with mild detergent and water.  Do not 

clean with solvents.  Allow the lift to dry thoroughly 

and apply lubricants as specified after every 

cleaning.

LPS2 General Purpose Penetrating Oil is recom-

mended where Light Oil is called out.  Use of 

improper lubricants can attract dirt or other con-

taminants which could result in wear or damage to 

components.  Plat-

form components 

exposed to contami-

nants when lowered 

to the ground may 

require extra atten-

tion.  

Perform mainte-

nance and lubrica-

tion procedures at 

the scheduled inter-

vals according to the 

number of cycles.  

When servicing the 

lift at the recommended intervals, inspection and 

lubrication procedures specified in the previous 

sections should be repeated. 

These intervals are a general guideline for sched-

uling maintenance procedures and will vary ac-

cording to lift use and conditions.  Lifts exposed to 

severe conditions (weather, environment, contami-

nation, heavy usage, etc.) may require inspection 

and maintenance procedures to be performed 

more often than specified.

 

Records of maintenance and service procedures 

should be maintained.

Discontinue lift use if maintenance and lubrication 

procedures are not properly performed, or if there 

is any sign of wear, damage or improper opera-

tion.  Contact your sales representative.

36514

36512

36513

Содержание Millennium 2 L917IB3751RP-2

Страница 1: ...iginal Instructions Original Instructions ISO 9001 2008 www braunability com international 631 West 11th Street Winamac IN 46996 USA Phone 1 574 946 6153 Fax 1 574 946 4670 International International...

Страница 2: ...edom for years Thank you again for your business and enjoy your independence Sincerely The Braun Employee Family XXXXXXXXXX INDIANA USA The Braun Corporation MFG DATE XX XXXXX SERIAL NUMBER MODEL NUMB...

Страница 3: ...nd Cables 13 14 Connect Interlocks 15 Lift Operating Instruction Decal 15 Platform Angle Adjustment 16 Tower Microswitch Adjustment 17 18 Installer Verification 19 20 Lift Operation Safety 21 23 Lift...

Страница 4: ...ock do not attempt to open the enclosure or gain access to areas where you are not instructed to do so Refer servicing to qualified service personnel only This symbol indicates that a condition where...

Страница 5: ...y and or property damage WARNING WARNING Read this manual supplement s and lift posted operating instructions decals before performing installation operation or service procedures Use appropriate pers...

Страница 6: ...r electric shock do not attempt to open the enclosure or gain access to areas where you are not instructed to do so Refer servicing to qualified service personnel only This symbol indicates that a con...

Страница 7: ...trical storms or similar electrical phenomena Use caution when operating this equipment in severe weather or environmental conditions fog rain snow ice dust etc Discontinue lift use immediately if any...

Страница 8: ...n powered electric wheelchairs off when on lift platform Press the DOWN switch until the entire platform rests on ground level lowered fully and the roll stop is fully unfolded ramp position before lo...

Страница 9: ...completed 15 600 cycles with a 363kg load and a static load test with a 1090kg 2400 lb load The 272kg 600 lb lift capacity Millennium 2 series lifts have completed 15 600 cycles with a 272kg load and...

Страница 10: ...B3454RP 2 L927FIB3751RP 2 L927IB3454RP 2 L927IB3751RP 2 L929FIBRP 2 L929IBRP 2 L990IB2740 2 64 84 68 35 64 84 68 35 64 84 64 84 64 84 64 84 68 35 64 84 68 35 64 84 64 84 55 14 60 20 57 15 60 20 57 15...

Страница 11: ...iled in this manual Any use of equipment other than instructed in this manual is prohibited Pump Module Front Hand Held Pendant Control Base Plate Base Plate Cover Top Parallel Arm 2 Adjustable Quiet...

Страница 12: ...t and the door or wall See Figure D Lift Tite Latches When checking ve hicle wall clearance allow the lift to drift fully into the Lift Tite latches to ensure clearance should drift occur See Figure F...

Страница 13: ...ns It is not permissible for the base plate to overhang the step well Base plate support must be constructed in the step well for lift support The structure must be level with the existing floor and o...

Страница 14: ...ion detail below Mounting Bolt Torque Tar get 40 Nm Check for obstruc tions such as gas lines wires exhaust etc before drilling or cutting Failure to do so may result in serious bodily injury and or p...

Страница 15: ...et Route cables clear of exhaust other hot areas and moving parts 4 Connect ground and power cables Lift Installation Attach Power and Ground Cables Figure I Vehicle Battery Positive Cable Install in...

Страница 16: ...gure J Vehicle Battery Ground Cable A 4 gauge 21 1mm2 ground cable must be connected from vehicle battery negative post to the same vehicle framing member the pump ground cable is attached to See Figu...

Страница 17: ...S Install 32638A in cavity 5 LIFT NOT STOWED 9 LIFT STOWED VEHICLE SECURE SIGNAL Grey Red LIFT SIGNAL Yellow Light Blue PUMP MODULE CONNECTOR J21 6 5 4 3 2 1 SIGNAL DEFINITION NO 9 COND WIRE CODE 7 VE...

Страница 18: ...side Arrows Direction of vehicle of vehicle Heel Ground Level Barrier must unfold fully Platform heel must lower fully Barrier Floor level Wedges option Figure C 2 1 Adjustment Procedure Platform angl...

Страница 19: ...parallel arm See Photo B Tower 2 Up Switch Adjustment Floor Position from Below Floor 1 Lower platform a minimum of 15 25 cm below floor level position using the manual hand pump or pendant control 2...

Страница 20: ...ift tower see Photo D Turn the switch adjust ment screw in or out as needed until the radius of the microswitch blade rides on the apex of the activation plate 3 Verify proper adjustment Criteria belo...

Страница 21: ...15 minute test period Verify that the vertical drift of the platform between the two measurements has not exceeded 15mm Verify that the angular drift of the platform between the two measurements has n...

Страница 22: ...ration below Loosen 9 16 hex nut on the relief valve adjustment screw do not remove hex nut 6 Turn adjustment screw clockwise 1 8 turn 7 Press UP switch and verify lift is able to operate throughout i...

Страница 23: ...or electric shock do not attempt to open the enclosure or gain access to areas where you are not instructed to do so Refer servicing to qualified service personnel only This symbol indicates that a co...

Страница 24: ...trical storms or similar electrical phenomena Use caution when operating this equipment in severe weather or environmental conditions fog rain snow ice dust etc Discontinue lift use immediately if any...

Страница 25: ...rn powered electric wheelchairs off when on lift platform Press the DOWN switch until the entire platform rests on ground level lowered fully and the roll stop is fully unfolded ramp position before l...

Страница 26: ...rate lift Hand held Pendant Control 36514 Lift Power ON OFF Switch This switch must be in the ON position in order to activate the lift The green Power Indicator Light illuminates to signal power to t...

Страница 27: ...ee Photo C Release switch 3 Unlock wheelchair brakes and unload passenger from platform OPEN DOOR S AND SECURE Lift Operating Instructions TO UNFOLD PLATFORM Stand clear and press the UNFOLD switch un...

Страница 28: ...st be fully unfolded ramp position until the entire wheelchair or standee has crossed the roll stop See Photos E and F Notice Passenger must be positioned fully inside yellow boundaries J I 2 Press UP...

Страница 29: ...2 Nm seats stops O P E N C L O S E AI B P Valve 1 30 92 O P E N C L O S E approximate 1 5 mm intervals Valve Tightening Specification Once valve seats stops tighten 2 to 3 Nm as shown Notice Close ba...

Страница 30: ...lease valve and turn counterclockwise open 1 4 turn only until the platform reaches ground level and the roll stop unfolds See Photo C Down To Lower Using hand pump handle a Place slotted end of pump...

Страница 31: ...ncy Stop E Stop Operating Instructions To Activate E Stop Push E Stop button down To Reset E Stop 1 Turn lift power OFF 2 Pull E Stop button up 3 Turn lift power ON Lift Pump Module E Stop Button Lift...

Страница 32: ...and the surrounding area before applying lubricants Clean only with mild detergent and water Do not clean with solvents Allow the lift to dry thoroughly and apply lubricants as specified after every...

Страница 33: ...Bearing 16 LO Lift Tite Latches Pivot Points 3 LO Lift Tite Latch Dampening Spring 2 springs 4 Points LO Saddle Support Bearings 8 LO Outer Fold Arm Cam Followers 4 LO Inner Outer Fold Arm Contact Are...

Страница 34: ...oth sides of slot See Lubrication Diagram Apply Light Oil See Lubrication Diagram Apply Light Oil See Lubrication Diagram Apply Light Oil See Lubrication Diagram Resecure replace damaged parts or othe...

Страница 35: ...s 8 Inner fold arm roller pin bearings 4 Inner fold arm cam followers 4 Parallel arm pivot pin bearings 16 Handrail pivot pin bearings 4 Hydraulic cylinder pivot bushings 8 Roll stop lever guide slot...

Страница 36: ...replace if needed Tighten repair or replace if needed Replace if needed Tighten or replace if needed Replace damaged parts and resecure as needed Apply Light Grease during reassembly procedures Replac...

Страница 37: ...ubrication Schedule Apply Door Ease or replace if needed See Lubrication Diagram Resecure or replace if needed Resecure repair or replace if needed Check to see that the lift is securely anchored to t...

Страница 38: ...nery Directive We hereby certify that the machinery described above conforms with the essential health and safety requirements of Council Directive 2006 42 EC on the approximation of the laws of the M...

Страница 39: ...e human body Safety of machinery Guards General requirements for the design and construction of fixed and moveable parts Safety of machinery Prevention of unexpected start up Safety of machinery Safet...

Страница 40: ...LTD Unit 1 Windsor Industrial Estate Rupert Street Aston Birmingham B7 4PR UK Phone 44 0 121 33 35 170 E mail contact autoadapt co uk Dual Parallel Arm Hydraulic Lift System Century 2 Millennium 2 Vi...

Страница 41: ...s The figures quoted are emission levels and are not necessarily safe working levels While there is a correlation between the emission and exposure levels this cannot be used reliably to determine whe...

Страница 42: ...Page 40...

Страница 43: ...Over 300 Braun Dealers Worldwide Providing Access to the World ISO 9001 2008 www braunability com international 631 West 11th Street Winamac IN 46996 USA Phone 1 574 946 6153 Fax 1 574 946 4670...

Страница 44: ...53 Fax 1 574 946 4670 All illustrations descriptions and specifications in this manual are based on the latest product information available at the time of publication The Braun Corporation reserves t...

Отзывы: