background image

Page 34

Maintenance and Lubrication Schedule

1500 

Cycles

Inspect outer fold arm pins (2), axles (2) 

and bearings (8) for wear or damage 

and positive securement

Remove pump module cover and 

inspect: 

•  Hydraulic hoses, fittings and 

connections for wear or leaks 

•  Harness cables, wires, terminals 

and connections for securement or 

damage

•  Relays, fuses, power switch and 

lights for securement or damage

Replace damaged parts and resecure 

as needed.  Apply Light Oil. 

Resecure, replace or correct as needed. 

4500 

Cycles

Resecure, replace or correct as needed

Use Braun 32840-QT hydraulic fluid 

(Exxon

®

 Univis HVI 26).  Do not mix 

with Dextron III or other hydraulic 

fluids.  Check fluid level with platform 

lowered fully.  Fill to maximum fluid 

level indicated on reservoir (specified 

on decal).  Do not overfill.  If fluid level 

decal is not present - measure 35mm 

(1-3/8") from the fill port to locate fluid 

level.

Tighten, repair or replace if needed. 

  

Tighten, repair or replace if needed.

Replace if needed. 

Tighten or replace if needed.

Replace damaged parts and resecure 

as needed.  Apply Light Grease during 

reassembly procedures.

Replace if needed.

Tighten, replace or correct as 

needed 

Inspect cotter pins on platform pivot pin 

(2)

Hydraulic Fluid (Pump) - Check level.  

Notice:  Fluid should be changed if 

there is visible contamination.  Inspect 

the hydraulic system (cylinder, hoses, 

fittings, seals, etc.) for leaks if fluid level 

is low.

Inspect cylinders, fittings and hydraulic 

connections for wear, damage or 

leaks 

Inspect roll stop cylinder hose assembly 

(hose, fasteners, connections, etc.) for 

wear, damage or leakage

Inspect parallel arms, bearings and 

pivot pins for visible wear or damage

Inspect parallel arm pivot pin mounting 

bolts (8)

Inspect platform pivot pins, bearings 

and vertical arms for wear, damage and 

positive securement

Inspect inner/outer fold arms, saddle, 

saddle support and associated pivot 

pins and bearings for visible wear or 

damage

Inspect gas springs (cylinders) for 

wear or damage, proper operation, and 

positive securement

  

Содержание Millennium 2 L917IB3751RP-2

Страница 1: ...iginal Instructions Original Instructions ISO 9001 2008 www braunability com international 631 West 11th Street Winamac IN 46996 USA Phone 1 574 946 6153 Fax 1 574 946 4670 International International...

Страница 2: ...edom for years Thank you again for your business and enjoy your independence Sincerely The Braun Employee Family XXXXXXXXXX INDIANA USA The Braun Corporation MFG DATE XX XXXXX SERIAL NUMBER MODEL NUMB...

Страница 3: ...nd Cables 13 14 Connect Interlocks 15 Lift Operating Instruction Decal 15 Platform Angle Adjustment 16 Tower Microswitch Adjustment 17 18 Installer Verification 19 20 Lift Operation Safety 21 23 Lift...

Страница 4: ...ock do not attempt to open the enclosure or gain access to areas where you are not instructed to do so Refer servicing to qualified service personnel only This symbol indicates that a condition where...

Страница 5: ...y and or property damage WARNING WARNING Read this manual supplement s and lift posted operating instructions decals before performing installation operation or service procedures Use appropriate pers...

Страница 6: ...r electric shock do not attempt to open the enclosure or gain access to areas where you are not instructed to do so Refer servicing to qualified service personnel only This symbol indicates that a con...

Страница 7: ...trical storms or similar electrical phenomena Use caution when operating this equipment in severe weather or environmental conditions fog rain snow ice dust etc Discontinue lift use immediately if any...

Страница 8: ...n powered electric wheelchairs off when on lift platform Press the DOWN switch until the entire platform rests on ground level lowered fully and the roll stop is fully unfolded ramp position before lo...

Страница 9: ...completed 15 600 cycles with a 363kg load and a static load test with a 1090kg 2400 lb load The 272kg 600 lb lift capacity Millennium 2 series lifts have completed 15 600 cycles with a 272kg load and...

Страница 10: ...B3454RP 2 L927FIB3751RP 2 L927IB3454RP 2 L927IB3751RP 2 L929FIBRP 2 L929IBRP 2 L990IB2740 2 64 84 68 35 64 84 68 35 64 84 64 84 64 84 64 84 68 35 64 84 68 35 64 84 64 84 55 14 60 20 57 15 60 20 57 15...

Страница 11: ...iled in this manual Any use of equipment other than instructed in this manual is prohibited Pump Module Front Hand Held Pendant Control Base Plate Base Plate Cover Top Parallel Arm 2 Adjustable Quiet...

Страница 12: ...t and the door or wall See Figure D Lift Tite Latches When checking ve hicle wall clearance allow the lift to drift fully into the Lift Tite latches to ensure clearance should drift occur See Figure F...

Страница 13: ...ns It is not permissible for the base plate to overhang the step well Base plate support must be constructed in the step well for lift support The structure must be level with the existing floor and o...

Страница 14: ...ion detail below Mounting Bolt Torque Tar get 40 Nm Check for obstruc tions such as gas lines wires exhaust etc before drilling or cutting Failure to do so may result in serious bodily injury and or p...

Страница 15: ...et Route cables clear of exhaust other hot areas and moving parts 4 Connect ground and power cables Lift Installation Attach Power and Ground Cables Figure I Vehicle Battery Positive Cable Install in...

Страница 16: ...gure J Vehicle Battery Ground Cable A 4 gauge 21 1mm2 ground cable must be connected from vehicle battery negative post to the same vehicle framing member the pump ground cable is attached to See Figu...

Страница 17: ...S Install 32638A in cavity 5 LIFT NOT STOWED 9 LIFT STOWED VEHICLE SECURE SIGNAL Grey Red LIFT SIGNAL Yellow Light Blue PUMP MODULE CONNECTOR J21 6 5 4 3 2 1 SIGNAL DEFINITION NO 9 COND WIRE CODE 7 VE...

Страница 18: ...side Arrows Direction of vehicle of vehicle Heel Ground Level Barrier must unfold fully Platform heel must lower fully Barrier Floor level Wedges option Figure C 2 1 Adjustment Procedure Platform angl...

Страница 19: ...parallel arm See Photo B Tower 2 Up Switch Adjustment Floor Position from Below Floor 1 Lower platform a minimum of 15 25 cm below floor level position using the manual hand pump or pendant control 2...

Страница 20: ...ift tower see Photo D Turn the switch adjust ment screw in or out as needed until the radius of the microswitch blade rides on the apex of the activation plate 3 Verify proper adjustment Criteria belo...

Страница 21: ...15 minute test period Verify that the vertical drift of the platform between the two measurements has not exceeded 15mm Verify that the angular drift of the platform between the two measurements has n...

Страница 22: ...ration below Loosen 9 16 hex nut on the relief valve adjustment screw do not remove hex nut 6 Turn adjustment screw clockwise 1 8 turn 7 Press UP switch and verify lift is able to operate throughout i...

Страница 23: ...or electric shock do not attempt to open the enclosure or gain access to areas where you are not instructed to do so Refer servicing to qualified service personnel only This symbol indicates that a co...

Страница 24: ...trical storms or similar electrical phenomena Use caution when operating this equipment in severe weather or environmental conditions fog rain snow ice dust etc Discontinue lift use immediately if any...

Страница 25: ...rn powered electric wheelchairs off when on lift platform Press the DOWN switch until the entire platform rests on ground level lowered fully and the roll stop is fully unfolded ramp position before l...

Страница 26: ...rate lift Hand held Pendant Control 36514 Lift Power ON OFF Switch This switch must be in the ON position in order to activate the lift The green Power Indicator Light illuminates to signal power to t...

Страница 27: ...ee Photo C Release switch 3 Unlock wheelchair brakes and unload passenger from platform OPEN DOOR S AND SECURE Lift Operating Instructions TO UNFOLD PLATFORM Stand clear and press the UNFOLD switch un...

Страница 28: ...st be fully unfolded ramp position until the entire wheelchair or standee has crossed the roll stop See Photos E and F Notice Passenger must be positioned fully inside yellow boundaries J I 2 Press UP...

Страница 29: ...2 Nm seats stops O P E N C L O S E AI B P Valve 1 30 92 O P E N C L O S E approximate 1 5 mm intervals Valve Tightening Specification Once valve seats stops tighten 2 to 3 Nm as shown Notice Close ba...

Страница 30: ...lease valve and turn counterclockwise open 1 4 turn only until the platform reaches ground level and the roll stop unfolds See Photo C Down To Lower Using hand pump handle a Place slotted end of pump...

Страница 31: ...ncy Stop E Stop Operating Instructions To Activate E Stop Push E Stop button down To Reset E Stop 1 Turn lift power OFF 2 Pull E Stop button up 3 Turn lift power ON Lift Pump Module E Stop Button Lift...

Страница 32: ...and the surrounding area before applying lubricants Clean only with mild detergent and water Do not clean with solvents Allow the lift to dry thoroughly and apply lubricants as specified after every...

Страница 33: ...Bearing 16 LO Lift Tite Latches Pivot Points 3 LO Lift Tite Latch Dampening Spring 2 springs 4 Points LO Saddle Support Bearings 8 LO Outer Fold Arm Cam Followers 4 LO Inner Outer Fold Arm Contact Are...

Страница 34: ...oth sides of slot See Lubrication Diagram Apply Light Oil See Lubrication Diagram Apply Light Oil See Lubrication Diagram Apply Light Oil See Lubrication Diagram Resecure replace damaged parts or othe...

Страница 35: ...s 8 Inner fold arm roller pin bearings 4 Inner fold arm cam followers 4 Parallel arm pivot pin bearings 16 Handrail pivot pin bearings 4 Hydraulic cylinder pivot bushings 8 Roll stop lever guide slot...

Страница 36: ...replace if needed Tighten repair or replace if needed Replace if needed Tighten or replace if needed Replace damaged parts and resecure as needed Apply Light Grease during reassembly procedures Replac...

Страница 37: ...ubrication Schedule Apply Door Ease or replace if needed See Lubrication Diagram Resecure or replace if needed Resecure repair or replace if needed Check to see that the lift is securely anchored to t...

Страница 38: ...nery Directive We hereby certify that the machinery described above conforms with the essential health and safety requirements of Council Directive 2006 42 EC on the approximation of the laws of the M...

Страница 39: ...e human body Safety of machinery Guards General requirements for the design and construction of fixed and moveable parts Safety of machinery Prevention of unexpected start up Safety of machinery Safet...

Страница 40: ...LTD Unit 1 Windsor Industrial Estate Rupert Street Aston Birmingham B7 4PR UK Phone 44 0 121 33 35 170 E mail contact autoadapt co uk Dual Parallel Arm Hydraulic Lift System Century 2 Millennium 2 Vi...

Страница 41: ...s The figures quoted are emission levels and are not necessarily safe working levels While there is a correlation between the emission and exposure levels this cannot be used reliably to determine whe...

Страница 42: ...Page 40...

Страница 43: ...Over 300 Braun Dealers Worldwide Providing Access to the World ISO 9001 2008 www braunability com international 631 West 11th Street Winamac IN 46996 USA Phone 1 574 946 6153 Fax 1 574 946 4670...

Страница 44: ...53 Fax 1 574 946 4670 All illustrations descriptions and specifications in this manual are based on the latest product information available at the time of publication The Braun Corporation reserves t...

Отзывы: