E.
Fasten heater head (with hose now attached and
leak-
tested) to the top of pole..
Tighten securely using
4 pcs
M6X10
(F
igure 6)
.
Do not remove any
bolts
.
F
igure 6
F.
**MANDATORY LEAK TEST REQUIRED**
Refer to page
4
, see header
:
“
LEAK TESTING THE CONNECTIONS
“
Proceed to test gas system as indicated
o
n page
4
.
Make sure to test hose and all
connections for leaks
.
Lift burner head and test hose connection to burner head.
G.
Place burner head so control button is
vertically
aligned with the instructions label on
the
post.
Place 1 steel washer over
each of the
3 bolts (
F
igure 7).
Install reflector over burner
head through
bolts.
Place steel washers over
each
bolt (
F
igure 8).
Secure reflector with
wing nuts.
F
igure 8
F
igure 7
8