2
S19-210B
Installation
1/13/2014
Bradley •
215-1797 Rev A; ECN 14-05-001
IMPORTANT!
Read this installation manual completely to ensure proper installation, then file it
with the owner or maintenance department. Compliance and conformity to drain
requirements and other local codes and ordinances is the responsibility of the installer.
Separate parts from packaging and make sure all parts are accounted for before
discarding any packaging material. If any parts are missing, do not begin installation
until you obtain the missing parts.
Flush the water supply lines before beginning installation and after installation is
complete. Test the unit for leaks and adequate water flow. Main water supply to the
eye/face wash should be “ON” at all times. Provisions shall be made to prevent
unauthorized shutoff.
The ANSI Z358.1 standard requires an uninterruptible supply of flushing fluid at a
minimum 30 PSI (0.21 MPa) flowing pressure. Flushing fluid should be tepid per ANSI
Z358.1.
The inspection and testing results of this equipment should be recorded weekly
to verify proper operation. This equipment should be inspected annually to ensure
compliance with ANSI Z358.1.
Workers who may come in contact with potentially hazardous materials should be
trained regarding the placement and proper operation of emergency equipment per
ANSI Z358.1.
For questions regarding the operation or installation of this product, visit www.
bradleycorp.com or call 1-800-BRADLEY.
Product warranties and service parts information may also be found under ”Products”
on our web site at www.bradleycorp.com.
Installation
THIS
SIDE
UP
Packing List
•
•
•
•
P.
O.
B
ox
3
09
, M
en
om
on
ee
F
all
s,
W
I 5
30
51
R
TE
ST
TH
IS
U
NIT
E
AC
H
W
EE
K
Te
st-
op
era
te
va
lv
e(s
) e
ac
h
we
ek
a
nd
s
ig
n
be
lo
w.
Re
po
rt
an
y
m
alf
un
cti
on
s im
m
edi
ate
ly.
Ve
ntil(e)
wö
ch
en
tlic
h im
Te
stb
etrieb
p
rü
fe
n,
b
es
tä
tig
t
du
rc
h
Un
te
rs
ch
rift
. J
eg
lic
he
S
tö
ru
ng
so
fo
rt
m
eld
en
.
Date
Datum
Date
Signed
Unter
sc
hrift
Signe
Date
Date
Date
Signed
Signed
Signed
DIE
SE
S
GE
RÄ
T
1S
T W
ÖC
HE
NT
LIC
H
ZU
P
RÜ
FE
N.
ES
SA
I H
EB
DO
M
AD
AI
RE
Te
st le
fo
nc
tio
nn
em
en
t d
es
valve
s
ch
aq
ue
s
em
ain
e
et
sig
ne
e
n
ba
s.
S'il
y
à
qu
elq
ue
ch
os
e
qu
i n
e
va
p
as
fa
it
un
rap
po
rt im
m
éd
ia
te
m
en
t.
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA
TEL: 1-800-BRADLEY FAX: (262-251-5817)
http://www.bradleycorp.com
114-051
Installation
Supplies Required:
• (3)
3
⁄
8
" floor anchors and bolts
• Piping to ½” NPT water supply inlet
• Pipe sealant
• Piping to 1¼” NPT drain outlet
• Sign-mounting hardware
Step 1: Secure base to floor
1 .
Install three suitable anchors (supplied by installer) for
3
⁄
8
" bolts in the floor .
2 .
Bolt the base to the floor anchors using
3
⁄
8
" bolts (supplied by installer).
Step 2: Assemble eye/face wash
1 .
Assemble eye/face wash components as shown on page 4
.
• Apply pipe sealant (supplied by installer) to all male-threaded pipe joints.
• Use the rubber grip pad provided or a strap wrench around pipes when tightening to prevent marring the Bradtect®
protective, safety yellow coating. Place the grip pad on the pipe, then put the wrench over the grip pad and turn the
pipe with the wrench.
Step 3: Connect water supply
1 . C
onnect the water supply piping (supplied by installer) to the ½" NPT inlet on the eyewash.
2. Connect the drain piping (supplied by installer) to the 1¼" NPT drain outlet on the eye/face wash.
3. Mount the safety sign to the wall using sign-mounting hardware (supplied by installer).