33
Nature of Fault
Examination
Point
Diagnostic Point
Values
Y/N
Action
Service
Procedure
Error code "11"
displayed on
digital monitor.
5. Check ignition
module.
1. Measure voltage
between grey ~ grey of
connector F
8
(sparker).
(See page 39)
2. # Remove connector
F
8
and measure the
resistance between
sparker and terminals.
(See page 39)
90 ~ 110 VAC
Is resistance >
1MΩ?
Yes
No
Yes
No
Go to B-5-2
Replace PCB
Go to B-5-3
Adjust/
Replace
ignition
module
IG2 – 2
IGI – 4
3. Check if unit is
sparking.
Is the ignition
module sparking?
Yes
No
Go to B-6
Adjust/
Replace
electrode
6. Check main gas
solenoid valve (SV0)
Error code 71
1. # Disconnect the main
solenoid valve connector
E from the PCB, and
measure the resistance
between pink ~ black
(SV0)
2. Measure voltage
between pink ~ black of
SV0 connector.
(See page 40)
1.7 ~ 2.1KΩ
80 ~ 100 VDC
Yes
No
Yes
No
Go to B-6-2
Replace gas
valve
Go to B-7
Replace PCB
IGI – 9
IGI – 2
7. Check solenoid
valve (SV1)
1. # Disconnect
connector E from the
PCB. Measure resistance
between yellow ~ black
of (SV1).
2. Measure voltage
between yellow ~ black
of SV1 connector.
(See page 40)
1.7 ~ 2.1KΩ
80 ~ 100 VDC
Yes
No
Yes
No
Go to B-7-2
Replace gas
valve
Go to B-8
Replace PCB
IGI – 9
IGI – 2
8. Check
changeover solenoid
valve (SV2)
1. # Disconnect
connector E from the
PCB. And measure
resistance between blue
~ black (SV2)
2. Measure the voltage
between blue ~ black or
SV2 connector.
(See page 40)
1.7 ~ 2.1KΩ
80 ~ 100 VDC
Yes
No
Yes
No
Go to B-8-2
Replace gas
valve
Go to B-9
Replace PCB
IGI – 9
IGI – 2
Error code "14"
displayed on
digital monitor
9. Check thermal
fuse
10. Check overheat
(remaining flame) bi-
metal switch
1. # Disconnect
connector B
3
and C
3
measure resistance
between red ~ red.
2. # Disconnect OHS
(remaining flame) bi-
metal switch festoon
terminal B
3
and C
3
, and
measure resistance
between terminal on
switch. (
See page 42)
Is resistance < 1Ω?
Is resistance < 1Ω?
Yes
No
Yes
No
Go to B-10
Replace
thermal fuse
Replace PCB
Replace
remaining
flame bi-metal
switch
IGI – 11
IGI – 2
VI - TROUBLESHOOTING
(cont.)
Troubleshooting Flow Chart
BEFORE CARRYING OUT CHECKS MARKED WITH
A # SIGN, DISCONNECT THE POWER SUPPLY.
Содержание Everhot IGI-180C-5N
Страница 7: ...I GENERAL INFORMATION cont CUT AWAY ILLUSTRATION 7...
Страница 8: ...I GENERAL INFORMATION cont SCHEMATIC ILLUSTRATION 8...
Страница 21: ...V SEQUENCE OF OPERATION cont Operation Sequence Flow Chart 21...
Страница 22: ...V SEQUENCE OF OPERATION cont Operation Sequence Flow Chart 22...
Страница 23: ...V SEQUENCE OF OPERATION cont Sequence Timing Chart 23...
Страница 24: ...V SEQUENCE OF OPERATION cont Sequence Timing Chart 24...
Страница 30: ...Wiring Schematic 30...
Страница 55: ...55 X PARTS BREAKDOWN Disassembled View Cabinet...
Страница 56: ...X PARTS BREAKDOWN Disassembled View Internals 56...
Страница 57: ...X PARTS BREAKDOWN Disassembled View Internals 57...
Страница 58: ...X PARTS BREAKDOWN Disassembled View Electrical 58...
Страница 62: ...62 Notes...
Страница 63: ...63 Notes...