40
If error “11” or “71” is displayed, check the main gas solenoid
valve.
a.
# Disconnect the main gas solenoid valve (SV0)
connector and measure the resistance at the solenoid
terminals.
Normal:
1.7 ~ 2.1 K Ω
If normal, check b below.
Faulty:
Replace gas valve.
(Service Procedure IGI-9, page 52)
b.
Measure voltage at the main gas solenoid (SV0)
Pink and black wires.
Normal:
80 ~ 100 VDC
If normal, proceed to check item 7 below.
Faulty:
Replace PCB unit.
(Service Procedure IGI-2, page 49)
If error “11” or “71” is displayed, check the change over
solenoid (SV1).
a.
# Disconnect the change over solenoid (SV1)
connector, and measure resistance at the solenoid
terminals.
Normal:
1.7 ~ 2.1 K Ω
If normal, check b below.
Faulty:
Replace the gas valve.
(Service Procedure IGI-9, page 52)
b.
Measure voltage at the change over solenoid
(SV1) yellow ~ black wires.
Normal:
80 ~ 100 VDC
If normal, check 8 below.
Faulty:
Replace PCB unit.
(Service Procedure IGI-2, page 49)
If error “11” or “71” is displayed, check the change over
solenoid (SV2).
a.
# Disconnect the changeover solenoid (SV2) connector,
and measure the resistance at the solenoid terminals.
Normal:
1.7 – 2.1 K Ω
If normal, check b below.
Faulty:
Replace the gas valve.
(Service Procedure IGI-9, page 52)
b.
Measure the voltage at the changeover solenoid (SV2),
blue – black wires.
Normal:
80 – 100 VDC
If normal, check 9, on next page.
Faulty:
Replace the PCB unit.
(Service Procedure IGI-2, page 49)
6) Is the main gas solenoid valve (SV0) operating normally ?
7) Is the change over solenoid (SV1) operating normally ?
8) Is the change over solenoid (SV2) operating normally?
VI - TROUBLESHOOTING
(cont.)
BEFORE CARRYING OUT CHECKS MARKED WITH A # SIGN, DISCONNECT THE POWER SUPPLY.
Содержание Everhot IGI-180C-5N
Страница 7: ...I GENERAL INFORMATION cont CUT AWAY ILLUSTRATION 7...
Страница 8: ...I GENERAL INFORMATION cont SCHEMATIC ILLUSTRATION 8...
Страница 21: ...V SEQUENCE OF OPERATION cont Operation Sequence Flow Chart 21...
Страница 22: ...V SEQUENCE OF OPERATION cont Operation Sequence Flow Chart 22...
Страница 23: ...V SEQUENCE OF OPERATION cont Sequence Timing Chart 23...
Страница 24: ...V SEQUENCE OF OPERATION cont Sequence Timing Chart 24...
Страница 30: ...Wiring Schematic 30...
Страница 55: ...55 X PARTS BREAKDOWN Disassembled View Cabinet...
Страница 56: ...X PARTS BREAKDOWN Disassembled View Internals 56...
Страница 57: ...X PARTS BREAKDOWN Disassembled View Internals 57...
Страница 58: ...X PARTS BREAKDOWN Disassembled View Electrical 58...
Страница 62: ...62 Notes...
Страница 63: ...63 Notes...