Stage

Set Point Differential

1             125˚ F         2˚ F

2             123˚ F         2˚ F

3             121˚ F         2˚ F

4             120˚ F         2˚ F

Re-program the set points and differentials to
meet your system hot water requirements.

The operating control uses a Liquid Crystal
Display for interactive prompting during
programming and display of sensed and assigned
set point and differential values.  Programming is
accomplished through the use of the four
programming keys.

1. Turn “OFF” the electrical power to the water 

heater.  If the power disconnect point is out of 
sight, lock it in the open (“OFF”) position and 
tag to prevent unexpected application
of power.

2. Open the water heater’s electrical access panel.

3. Verify that the unit is properly applied and the 

model number on the rating plate correctly 
identifies the unit.

4. Turn the electrical power switch to the “ON” 

position.  The control will  begin counting 
down from 210.  This countdown sequence 
will last for approximately 3-1/2 minutes.

5.

To override this time delay, press 

Select.

6. Press 

Select

to display the current stage

set point.

7.

Press 

Up Arrow

key to increase or 

Down

Arrow

key to decrease to the desired

set point.

8.

Press 

Enter

to enter the displayed value

into memory.

9.

Press 

Select

to display the current stage 

switching differential.

10. Press 

Up Arrow

key to increase or 

Down

Arrow

key to decrease to the desired 

switching differential.

11. Press 

Enter

to enter the displayed value

into memory.

12. Repeat steps 6 through 11 to program each 

additional stage.

13. Press 

Select, Select, Select, Select

(4 times) 

to return to stage 1 parameters. Scroll 
through the  programming loop a second 
time to confirm that the appropriate values 
have been entered into memory by
pressing Select.

14. Press 

Select

after viewing the switching 

differential for the final stage to display 
stored water temperature.

15. Close the water heater’s electrical

access panel.

16. The temperature control is now ready

for operation.

17

When power is initially

applied to a new water heater, the control
points will be pre-programmed.

The

factory final quality test sets the unit for
test firing. The preset values are as follows:

NOTE:

PROGRAMMING

TEMPERATURE ADJUSTMENT

HAZARD OF ELECTRICAL SHOCK –
Full power is present whenever the cabinet
door is open and the main power
disconnect is in the “ON” position, even
with the pilot switch(es) turned off.

WARNING: 

Содержание CHP-I&S-01

Страница 1: ...acturer s warranty Follow start up procedure in the manual Water heater corrosion and component failure caused by air borne chemical vapors is not covered under the manufacturer s warranty Corrosion d...

Страница 2: ...on 8 Relief Valve 8 Thermal Expansion 8 Cathodic Protection 9 Electrical Service Electrical Connection 9 Wire Sizing 9 Fusing 9 Electrical Connection 9 Jacket Assembly 10 Standard and Optional Control...

Страница 3: ...3 FIG 2 Front View Vertical Square Models FIG 1 Front View Vertical Round Models FIG 3 Front View Horizontal Models...

Страница 4: ...t must conform to the CAE C22 1 Canadian Electrical Code Part 1 and or local Electrical Codes This complete appliance is design certified and Listed by Underwriters Laboratories as a commercial storag...

Страница 5: ...ture of the space where the appliance is installed must not go below 32 F 0 C or above 104 F 40 C The lower pan of the horizontal water heater jacket or vertical square water heater jacket is speciall...

Страница 6: ...d heating elements Top 12 30cm for service access to electrical service water connections and piping Water Pipes 1 25 4mm 6 FIG 5 Clearances from Combustible Construction 12 36 6 FIG 4 Clearances from...

Страница 7: ...oor following applicable architectural and local code requirements or accepted standards for the specific site and model purchased In areas prone to seismic activity it is recommended that the water h...

Страница 8: ...ater heater is supplied with a temperature and pressure relief valve s sized in accordance with ASME Boiler and Pressure Vessel Code Section IV Some water heaters may be supplied with an optional pres...

Страница 9: ...NFPA No 70 When the appliance is installed in Canada it must conform to the CAE C22 1 Canadian Electrical Code Part 1 and or local Electrical Codes 1 Use copper conductors only All wiring between the...

Страница 10: ...sity immersion heating elements with an incoloy sheath Internal fusing of all elements in a maximum of 48 amp increments provides additional safety Fuse cartridges are related at 1 000 000 amps interr...

Страница 11: ...of various control failures Time clock to control off on cycles of the heater as programmed by the owner or electric utility requirements Low water pressure switch High water pressure switch A main po...

Страница 12: ...l circuit supplying power to the immersion heating elements When the thermostat is satisfied the contactor coil is de energized and power to the heating elements is turned off CONTROL CIRCUIT TRANSFOR...

Страница 13: ...has an adjustable thermostat to control water temperature The thermostat is factory pre set at approximately 125 F 51 7 C or less Households with small children or invalids may require a 120 F 48 9 C...

Страница 14: ...scalds Children disabled and elderly are at highest risk of being scalded See instruction manual before setting temperature at heating appliance If this appliance is used to produce water that could...

Страница 15: ...arrow Down arrow and Enter Select Key Sequentially prompts the user as to what parameter is being displayed set point differential stage energized operation mode heat indication of assigned stage 1 2...

Страница 16: ...rential 8o F Output Energized Stage One Energized at 152o F Output De energized Stage One De energized at 160o F Each available stage of operation must be programmed with a set point and a differentia...

Страница 17: ...r Down Arrow key to decrease to the desired set point 8 Press Enter to enter the displayed value into memory 9 Press Select to display the current stage switching differential 10 Press Up Arrow key to...

Страница 18: ...or cannot be field repaired Replace the water heater s electronic temperature control OE ROM Error The internal ROM of the microprocessor in the boiler s electronic temperature control is defective Th...

Страница 19: ...ment gasket must be replaced with a new gasket when an element is removed for inspection cleaning or replacement The optional safety door interlock is an electrically operated locking pawl that is ene...

Страница 20: ...eater storage tank If the water pressure drops below an adjustable set point the control circuit is opened and operation of the water heater is shut down The low water pressure switch may be specified...

Страница 21: ...schedule is maintained in periods where there may be power interruptions The time clock works by making and breaking the 120 VAC control circuit to the contactor coils to shut down operation of the h...

Страница 22: ...expansion The system must make allowance for this expansion If an expansion tank is not provided in the system water pressure may increase to the point where the water heater s temperature and pressu...

Страница 23: ...starts heating check the contactors for buzzing or chattering during operation If noise is detected turn off main power open the control panel and clean the contact points of the magnetic contactor s...

Страница 24: ...ng and start up procedure to place the water heater back into service Listed below are items that must be checked to insure safe reliable operations Verify proper operation after servicing The tempera...

Страница 25: ...in the hot water system because heated water increases the rate of corrosive chemical reactions 25 Water heater maintenance includes periodic tank flushing cleaning and removal of lime scale from the...

Страница 26: ...e exposed ends of the elements which are not accessible through the front element access door 3 Disconnect the wires attached to the element terminals Try not to disturb the wiring unnecessarily and r...

Страница 27: ...contactor or thermostat may be malfunctioning 4 The capacity of the heater may have been exceeded by a large demand for hot water Large demands require a recovery period to restore water temperature 5...

Страница 28: ...encountered local codes or inspection agency should be consulted to determine which of the following procedures is acceptable in your area Installation of an expansion tank Removal of the check valve...

Отзывы: