7.0 Preparation

To prevent damage due to shipping vibration, several components of the system have been unin-

stalled after testing and must be reinstalled prior to system installation and start-up. 

The tools and materials needed to reinstall these components  are:

 

12mm wrench

Phillips head screwdriver                                                                                                                      7

Liquid Teflon (preferred) or Teflon tape.

                                                                                                                                                             8

Power Transformer:

Connect the 24V DC power transformer to the AC power cord. Connect the 24V DC jack into the 

corresponding slot marked “ELECTRICITY” found on the outside of the upper portion of the RGW 

system. Do not connect the AC power cord to the AC outlet at this time.

Clean Out Drain Valve:

The clean out drain valve is a 1” socket and 1" male threaded PVC ball valve and is included in the 

installation kit. Apply Teflon to the male threads of ball valve and screw into the bottom of the tank by 

hand until it is snug, being careful not to cross-thread. Orientate so the valve handle is on top.

Suction Foot Valve Unit :

This assembly is identified by a plastic foot valve on one end and a grey PVC elbow with a 

stainless steel flange attached at the other end. Remove two bolts and rubber gasket from 

the side of the pump. Fill the pipe with approximately 2 liters  (.5 gal.) of water through the 

elbow. Place the foot valve end of the pipe through the 2” hole closest to the centre of the 

black platform disk and lower the pipe until the steel flange aligns with the corresponding 

mating surface on the pump.

Press the black rubber grommet found on the pipe, into the 2” hole on the black support   

disc to make the proper seal. Securely attach the flange and gasket to the pump with      the 

two bolts using a 12 mm wrench.

Water Level Sensor Unit:

This assembly is identified is identified as a long grey pipe with an electrical wire and con-

nector exiting from one end. Use the yellow rubber gasket (supplied) and gently slide it over 

the pipe up against the PVC flange. Place the end opposite of the wires through the 1-3/8” 

hole near the edge of the platform disk and lower the pipe until the PVC flange rests on the 

black support plate. Secure with three Phillips screws (supplied) using a Phillips head screw-

driver. Connect the level sensor pipe’s electrical connector to the vacant connector on the  

wiring harness.

Содержание RGW-150

Страница 1: ...INSTALLATION MANUAL AND USER GUIDE RGW 150 RGW 250 RGW 350 RGW 450 V1 12 UG_RGW_v1 12_EN June 7 2010 9 16 AM BRAC SYSTEMS GREY WATER RECYCLING Residential Series...

Страница 2: ...E INSTALLA TION CHECKLIST SUPPLIED WITH THIS MANUAL The content of this guide is based upon the latest information available at the time of printing and is aimed at providing a general introduction to...

Страница 3: ...6 0 Installation Kit 8 7 0 Preparation 9 8 0 Installation 10 9 0 System Connections 11 10 0 Priming and Start Up 12 11 0 BC 100 Controller 13 12 0 Pump Manual 14 13 0 Technical Data 15 14 0 Maintenanc...

Страница 4: ...lowing the grey water to be treated to a safe level without becoming over chlorinated The RGW series requires a connection to your home s sanitary drain and should only be installed by a licensed plum...

Страница 5: ...njury read all the instructions before using this unit This system is intended for household use only as described in this manual Any other use including but not limited to commercial agricultural or...

Страница 6: ...Page 6 UG_RGW_v1 12_EN 3 0 Safety Components Figure 1 Backwater Valve Figure 2 Non Contamination System SWING CHECK VALVE OVERFLOW 3 PIPE FROM RGW OVERFLOW PIPE TO SEWER SYSTEM TO SEWER SYSTEM...

Страница 7: ...r Grey Water Suction Unit Grey Water Suction Foot Valve Unit Air Gap Fresh Water Chlorinator www bracsystems com Brac Grey Water Controller BC 100 Enabled Integrated Water Processing 4 0 System Compon...

Страница 8: ...ss connection control 4 device if required by local codes and freshwater bypass line A grey water supply connection to toilets 5 A 1 clean out drain valve supplied connect to the sewer line if require...

Страница 9: ...valve on one end and a grey PVC elbow with a stainless steel flange attached at the other end Remove two bolts and rubber gasket from the side of the pump Fill the pipe with approximately 2 liters 5 g...

Страница 10: ...l prevent the loss of grey water through the bypass during normal operation See figure 5 Install a P Trap and an approved backwater valve such as a swing check valve down stream 4 of the overflow port...

Страница 11: ...vice prevents contamination in the event of a sewage back up The cross connection control device prevents contamination of the potable water system The freshwater bypass valve provides water to toilet...

Страница 12: ...ff valve Plug in the pump s AC power cord The pump should begin drawing water and pressurizing the 4 service lines Once the pump is primed and the grey water OUT line is pressurized it will take 8 sec...

Страница 13: ...ing cycles at more convenient times for the household The enabled LED should be green to show that the system is operational If the LED flashes this indicates that water level sensor has not been conn...

Страница 14: ...2 Maintenance Under normal operating conditions the pump does not require any maintenance as long as the fol lowing points are observed 1 Periodically check the condition of the check valve located un...

Страница 15: ...5 8 4 5 3 2 2 0 6 250 350 450 10 22 5 22 1 21 7 21 3 20 8 20 5 67 20 20 7 20 2 19 8 19 2 18 8 18 2 30 18 3 17 8 17 1 16 2 15 3 14 2 40 14 7 13 8 12 9 12 1 11 1 10 2 50 10 5 9 3 8 1 6 9 5 6 4 3 RGW Mo...

Страница 16: ...140 gram 5oz tablets Replace the chlorinator lid and tighten se curely We recommend that the NORWECO brand Bio Sanitizer Calcium Hypochlorite disinfecting tablets be used Some jurisdictions require t...

Страница 17: ...cap Replace the filter back into the filter housings and replace the screw cap Replace the RGW system lid 13 Close the potable bypass valve if applicable 14 Open the grey water bypass valve if applic...

Страница 18: ...f the strainer screen is clean no further action is necessary and the flange can be replaced onto the pump and the two bolts inserted and tightened Remove the gasket from the flange and take out the s...

Страница 19: ...ve the black screw cap on the filter housing and remove the filter See figure 6 8 Pour a minimum of five liters of household vinegar through the filter housing and leave for fifteen 9 minutes Apply a...

Страница 20: ...reuse grey water A Yes when first disinfected and used in an appropriate way Grey water can contain disease causing micro organisms such as bacteria protozoa viruses and parasites It may also contain...

Страница 21: ...nisms to survive and cause infection is considered remote Grey water from the bathroom is suitable for reuse Laundry A Check local plumbing codes If the laundry option is allowed in your jurisdiction...

Страница 22: ...w can I improve grey water quality by using different types of soaps or deter gents A The choice of cleaning products can reduce the environmental impact of grey water Common washing powders contain s...

Страница 23: ...ply your toilets with fresh water and prevent the contamination of your fresh water with grey water in the event of an extended power outage or removal of the tank If the tank must be removed a drain...

Страница 24: ...eset activation pump otherwise the pump will not start Q What is the maximum pressures switch activation point A Adjust the pressure only when the cut in pressure is higher than the preset activation...

Страница 25: ...ks and repair 2 Defective check valve or suction foot valve Inspect and clean check valve and or foot valve Replace if necessary Pump starts and stops too frequently 1 Leakage in suction foot valve pi...

Страница 26: ...and the system can be re primed Refer to chapter 10 0 Priming and Start up 2 Pump has lost it s prime Re prime pump Refer to chapter 10 0 Priming and Start up Lower tank is full and draining out of o...

Страница 27: ...l Non conformity of local plumbing codes Connection to an improper source or for improper use Misuse abuse negligence physical damage or accidents Improper service and or maintenance Repair changes or...

Страница 28: ..._________________ IMPORTANT To activate your warranty and register your product please complete the Product Registration and Installation Check List form supplied with this system and mail to BRAC Sys...

Отзывы: