82
16. Install the Base Assemblies on the new Engine Assembly one at a
time. Tilt the Engine Assembly to the side and slide the correct Base
Assembly into position and install the hardware. It may be helpful to put
DVWDWLFVROLGREMHFWOLNHDERRNRUER[XQGHUWKHIURQWWXEHWRDOLJQWKH
screws and holes.
This step requires two people.
%HVXUHWR)8//<WLJKWHQKDUGZDUHZLWKPPKH[ZUHQFKZKHQDOO
KDUGZDUHKDVEHHQ¿QJHUWLJKWHQHG5HPRYHWKHVKLSSLQJSODWIRUPDQG
set it safely aside.
In order to avoid possible serious injury, when installing the
Base Assemblies to the Engine Assembly, be careful to avoid
ÀQJHUVRUKDQGVEHLQJFDXJKWRUSLQFKHG
13. The remaining assembly steps are the reverse procedure.
NOTICE:
Align the clips on the cable connectors and make sure the
connectors lock. Do not crimp the cables.
Note:
Installation of the Lateral Links does not require the Lateral Link
Puller.
3XWWKH/HIW8SSHU6KURXGLQSRVLWLRQ¿UVW$OLJQWKH5LJKW8SSHU
Shroud with the Push Fasteners and move the Right Shroud into
position. Push the Shrouds together so that the Push Fasten-
ers are fully seated. Using a #2 Phillips screwdriver, install the 6
screws.
Self-tapping screws attach the Shrouds to the Frame.
Re-install the Mast Gasket.
Be sure the Handlebar Links are tilted forward. Put the Wave Washers on
the pivot rods.
Be aware that the Handlebar Arms are top heavy, and will
want to pivot when attached onto the Pivot Rod. Be sure to
stay out of the path of the Handlebar.
Align the Handlebar Arm assembly with the pivot rod and attach the lower
Handlebar Arm to the Handlebar Link
20. Inspect your machine to ensure that all hardware is tight and
components are properly assembled.
Do not use until the machine has been fully assembled and
inspected for correct performance in accordance with the
2ZQHU·V0DQXDO