61
34. The remaining assembly steps are the reverse procedure.
Note:
3XWWKH/HIW8SSHU6KURXGLQSRVLWLRQ¿UVW$OLJQWKH5LJKW8SSHU6KURXG
with the Push Fasteners and move the Right Shroud into position. Push the
Shrouds together so that the Push Fasteners are fully seated. Using a #2
Phillips screwdriver, install the 6 screws.
Self-tapping screws attach the Shrouds to the Frame.
Re-install the Mast Gasket.
Be sure the Handlebar Links are tilted forward. Put the Wave Washers on the pivot
rods.
Be aware that the Handlebar Arms are top heavy, and will want to pivot
when attached onto the Pivot Rod. Be sure to stay out of the path of
the Handlebar.
Align the Handlebar Arm assembly with the pivot rod and attach the lower
Handlebar Arm to the Handlebar Link
35. Inspect your machine to ensure that all hardware is tight and components are
properly assembled.
Do not use until the machine has been fully assembled and inspected
IRUFRUUHFWSHUIRUPDQFHLQDFFRUGDQFHZLWKWKH2ZQHU·V0DQXDO