9
Install Guide - SleekWall
STEP-BY-STEP
GUIDE
PALING
INSTALLATION
STEP 3
-
FITTING PALINGS
The palings have a groove one side and a tongue the other so that they interlock when stacked on
each other.
Starting at the bottom, slide and screw the first paling into the channel with the tongue up. Then slide
the next paling in with its groove locking over the tongue, and repeat until they are all stacked. Then
place the tongue cover over the last paling, and screw into place.
If you are doing a lower height than 1800mm, you will need to divide the height of your wall into the
number of palings you have to obtain closest number of palings.
NOTE -
It is important to maintain both parallel and level within each bay. This will ensure a straight
looking fence.
This can be achieved by using a tape measure to check for the “Parallel” from either the top of the
channel or your starting point.
Post to be 10mm
higher for post cap
One screw per slat is all
that’s required