STANDARD ‘POST CENTRE TO POST CENTRE’ GUIDE

The table below allows you to work out what 

your post centres will be. If you have 1780mm 

paling [allowing for 10mm either side for the 

channel] and you are using 65 x 65 posts then 

you will have an 1865mm post centre to post 

centre.

This also shows the in-between measurements, 

should you be fitting your paling between posts 

other than a 65 x 65 profile, i .e. timber posts ot 

concrete blocks etc.

TGV Paling Length

65 x 65

Post Hole Centres

In-between Post 

Measurements

1780mm Paling

1865mm

1800mm

Wall Height

Hole Depth into 

Firm Earth or Clay

900mm

450mm

1200mm

550mm

1500mm

600mm

1800mm

600mm

Please note that 1800mm is the standard height. Heights lower than 
1800mm can be done using these components, with wastage.

!

IMPORTANT

For higher walls you will need 
engineering advice beyond the scope of 

this publication.

!

IMPORTANT

The diameter of your holes should be 
large enough to have a minimum of 

75mm clearance around the post.

!

IMPORTANT

When using vertical conversion kit, post centre may differ depending on desired outcome

Содержание SLEEKWALL SOLID

Страница 1: ...SLEEKWALL SOLID A STEP BY STEP GUIDE TO INSTALLING YOUR FENCE INSTALL GUIDE...

Страница 2: ...DTHIS TOOLS LIST It is recommended that the reader pays particular attention to those items identified as IMPORTANT in this manual to ensure satisfactory long term performance IMPORTANT the table in S...

Страница 3: ...items are not included but one type of post and cap are required for installation 145 x 16 x 1780mm TGV PALING 30 x 30 PALING CHANNEL CHANNEL COVER CLIP CHANNEL ENDS CAPS LEFT RIGHT TEK SCREWS 65 x 6...

Страница 4: ...r posthole centres using the table below as a guide and mark out your posthole positions on the ground with line marking paint NOTE Postholes can be dug by hand or with a mechanical auger Use the foot...

Страница 5: ...imber posts ot concrete blocks etc TGV Paling Length 65 x 65 Post Hole Centres In between Post Measurements 1780mm Paling 1865mm 1800mm Wall Height Hole Depth into Firm Earth or Clay 900mm 450mm 1200m...

Страница 6: ...e concrete is being poured Avoid using quick setting concrete as it can be corrosive to aluminium posts IMPORTANT Allow 75mm min from edge of post to edge of ground Slop top of concrete away from post...

Страница 7: ...same principal of the gap between a string line and the posts works for both in ground and flanged posts this will ensure a straight line of posts Refer to page 6 for a diagram of this Refer to the ta...

Страница 8: ...round it may be required that you step your fence from bay to bay Once a height has been established for all your channels with the tek screws supplied screw your channel directly to your post whilst...

Страница 9: ...hey are all stacked Then place the tongue cover over the last paling and screw into place If you are doing a lower height than 1800mm you will need to divide the height of your wall into the number of...

Страница 10: ...is to use either a rubber mallet or the rubber handle of your hammer Insert one edge of the cover clip into the channel then with the rubber mallet hammer handle from either the top or bottom Tap the...

Страница 11: ...DE CAPPING INSTALLATION STEP 6 FITTING CHANNEL CAPS Once all the palings have been installed we have an optional cap to cover the profile of the slat channel system These consist of a left and right h...

Страница 12: ...S Yes we have a 10 year warranty on our products If you are in a coastal zone then an increase of cleaning and maintenance will be required We do not recommend the product to be in direct contact with...

Страница 13: ...0800 003 006 boundaryline co nz...

Отзывы: