1 689 989 106
2012-09-10
|
Robert Bosch GmbH
Using the mobile set | VLS 3130 | 31
en
7.
Using the mobile set
The mobile set is available as a special accessory. It
allows the VLS 3130 to be transported across short
distances (e.g. in a workshop).
The mobile set consists of a draw bar and two
attachable running rollers.
!
Requirements for transport via mobile set:
$
Lifting platform is not anchored.
$
Ground is even.
$
Ground is smooth and firm.
DANGER – falling lifting platform!
Risk of crushing in event of incorrect transport
of lifting platform using mobile set.
Ensure that there are no persons or objects
in the vicinity of the lifting platform.
Never reach underneath the base plate of
the lifting platform!
Avoid jerky movements when transporting
the lifting platform on the running rollers.
Fitting the running rollers
1.
Raise the empty lifting platform by approx. 50 cm.
2.
Attach the running rollers to the front transverse bar
(fixed bearing) and secure with bolts.
Fig. 7:
Fitting the mobile set
1 Attachable running rollers
2 Attachment point for draw bar
3 Draw bar with wheels
3.
Fully lower the lifting platform.
The rotation of the front transverse bar presses
the running rollers onto the ground.
The front end of the lifting platform rests on the
running rollers.
Fig. 8:
Attachable running roller after lowering of lifting
platform
Transporting the lifting platform
1.
Disconnect the mains plug of the operating unit.
2.
Place the operating unit on the lifting table.
!
Ensure that the operating unit cannot fall during
transport.
3.
Affix the bolt of the draw bar to the attachment
point on the front transverse bar.
4.
Push the draw bar handle down to raise the lifting
platform.
5.
Ensure that there are no persons or objects in the
vicinity of the lifting platform.
6.
Use the draw bar to move the lifting platform to
the desired location.
7.
Set down the lifting platform and remove the
draw bar.
Removing the running rollers
1.
Set up the operating unit at the new location.
2.
Connect the mains plug of the operating unit.
3.
Raise the empty lifting platform by approx. 50 cm.
4.
Remove the bolts and detach the attachable
running rollers.
5.
Fully lower the lifting platform.
"
The lifting platform is ready for operation again.