UPS operation
+24 V In
+24 V Out
> 120 sec.
5 sec.
t
6 sec.
Fig.6-23:
Timing
Switch position S1
Time t
0
5 seconds
1
1 minute
2
2 minutes
3
3 minutes
4
5 seconds
5
1 minute
6
2 minutes
7
3 minutes
Fig.6-24:
Activation of the supply voltage during UPS operation
+24 V In
UPS operation
24 V Out
120 sec.
Fig.6-25:
Timing
Switch position S1
Time t
0
5 seconds
1
1 minutes
2
2 minutes
3
3 minutes
Fig.6-26:
Switching on, switching off and and switching on again for switch posi‐
tions 0 to 3
+24 V In
UPS operation
24 V Out
5 sec.
t
6 sec.
Fig.6-27:
Timing
Switch position S1
Time t
4
5 seconds
5
1 minute
32/45
Bosch Rexroth AG | Electric Drives
and Controls
Rexroth IndraControl VAU 01.1Z | Project Planning Manual
Interfaces, Display and Operating Components
Содержание Rexroth IndraControl VAU 01.1Z
Страница 1: ...Electric Drives and Controls Pneumatics Service Linear Motion and Assembly Technologies Hydraulics ...
Страница 36: ...34 45 Bosch Rexroth AG Electric Drives and Controls Rexroth IndraControl VAU 01 1Z Project Planning Manual ...
Страница 38: ...36 45 Bosch Rexroth AG Electric Drives and Controls Rexroth IndraControl VAU 01 1Z Project Planning Manual ...
Страница 40: ...38 45 Bosch Rexroth AG Electric Drives and Controls Rexroth IndraControl VAU 01 1Z Project Planning Manual ...
Страница 44: ...42 45 Bosch Rexroth AG Electric Drives and Controls Rexroth IndraControl VAU 01 1Z Project Planning Manual ...
Страница 46: ...44 45 Bosch Rexroth AG Electric Drives and Controls Rexroth IndraControl VAU 01 1Z Project Planning Manual ...