
26
|
Common Applications of KBR boilers
Greenstar FS
6 720 810 590 (2015/05)
5
Common Applications of KBR boilers
5.1
Multiple zones using zone valves with DHW
Fig. 10 Piping
[1]
Supply to heating zone 2
[2]
Motorized valve heating zone 2
[3]
Supply to heating zone 1
[4]
Motorized valve heating zone 1
[5]
System pump
[6]
DHW pump
[7]
Supply to indirect tank
[8]
Drain/Bleed point
[9]
Boiler supply pipe 1¼ "
[10] Low Loss Header
[11] Heat only boiler
[12] Boiler return pipe 1¼ "
[13] Return from indirect tank
[14] Return from heating zone 1
[15] Return from heating zone 2
[16] Drain/Bleed point
[17] Combination fast fill/back flow preventer
[18] Expansion (tank) vessel
5.1.1
To utilize the LLH
▶ Switch off and isolate the boiler
▶ Drain the boiler
▶ Remove front panel
▶ Locate the LLH at the left-hand side of the lower section of the boiler
1. Unscrew the cap [a] from the body of the LLH [c]
– This will break the label across the cap and body indicating that
the LLH has been employed
2. Withdraw the cap [a] and plunger assembly [b]
3. Unscrew the plunger assembly [b] from the cap [a],
4. Set the plunger assembly [b] aside
5. Re-fit the cap [a] without the plunger assembly [b]
6. Tighten the cap [a] and ensure it is secure.
Fig. 11 Utilizing the LLH
6720810590-15.1W
o
M
M
1
3
7
2
4
6
5
18
9
17
8
12
13
14
15
11
10
16
c
a
b
2.
4.
1.
5.
6.
6720811590-37.1Wo
3.
Содержание KBR16-3
Страница 81: ...Spare parts 81 6 720 810 590 2015 05 Greenstar FS Fig 94 Group 1 Sheet metal Greenstar 6720810590 73 1Wo ...
Страница 85: ...Spare parts 85 6 720 810 590 2015 05 Greenstar FS Fig 96 Group 3 Gas valve Greenstar 6720810590 75 1Wo ...
Страница 91: ...Spare parts 91 6 720 810 590 2015 05 Greenstar FS Fig 99 Group 6 Control box Greenstar 6720810590 78 1Wo ...
Страница 98: ...98 Greenstar FS 6 720 810 590 2015 05 Notes ...
Страница 99: ... 99 6 720 810 590 2015 05 Greenstar FS Notes ...