2.
Turn on the receiver Function switch 2 (Level Check). Follow steps 3 and 4 as listed in
the Level LED - alignment of the Upper Beam, page 20. If the LED turns off, alignment is
complete.
1
Figure 7.2: LED alignment
Callout
ー
Description
1
ー
Receiver LED console
Volt meter alignment
Insert the volt meter leads into the alignment check terminals of the receiver to check voltage.
If the value is 3.0 V or higher, the adjustment is completed. If less than 3.0 V, adjust the
receiver and transmitter until 3.0 V is obtained.
Notice!
In an ideal environment, the voltage is 3.0 VDC or above.
1
Figure 7.3: Volt meter alignment
Callout
﹘
Description
1
ー
Alignment check terminals
Notice!
Turn on Function switches 1 and 2 of the transmitter after finishing the alignment to verify the
monitor LEDs light up once every 3 seconds.
7.3
Photobeam 5000
Optical alignment | en
21
Bosch Security Systems, Inc.
Installation and Operation Guide
2016.02 | 03 | F.01U.305.910
Содержание ISC-FPB1-W120QS
Страница 1: ...Photobeam 5000 ISC FPB1 W60QS ISC FPB1 W120QS ISC FPB1 W200QS en Installation and Operation Guide ...
Страница 2: ......
Страница 26: ......
Страница 27: ......