Installing the Housing
Use the panel housing to draw drill holes at the desired location
on the wall (arrows in figure below). As an option, you can use
the mounting dimensions indicated on the back of the housing.
Ensure that the housing is aligned horizontally and draw on the
holes using the built-in spirit level in the upper left corner. The
dimensions can be taken from the drilling jib on the rear of the
housing. Drill the holes.
Guide the cables routed under plaster through the punched out
cable ducts on the rear of the housing into the housing. Mount
the housing to the wall using screws. Make sure that cables are
not pinched.
Then guide the cables routed on plaster through the cable
entries to the upper side of the housing.
3x
( 8 x 40 mm)
3x
6 x 50 mm
PZ3
S8
3x
6 x 50 mm
PZ3
8mm
PZ3
3x
( 8 x 40 mm)
3x
6 x 50 mm
PZ3
S8
3x
6 x 50 mm
PZ3
8mm
PZ3
3.2.3
Conventional Fire Panel
Installation | en
15
Bosch Sicherheitssysteme GmbH
2014.06 | 7.0 | F.01U.172.980
Содержание FPC-500-2
Страница 1: ...Conventional Fire Panel FPC 500 2 FPC 500 4 FPC 500 8 en Installation Guide ...
Страница 2: ......
Страница 81: ......