Installation
|
25
AU/NZ
6 720 646 195a (2010/11)
4.3
Unpacking the boiler
1. Outer carton
2. Inner sleeve (unwrap from front)
3. Packing base
4. Protective wrapping
5. boiler outer case
B
Remove outer carton (1) and place safely away from
the working area.
B
With the outer packaging removed and the inner
sleeve (2) still in place gently lay the boiler on its
back.
B
The boiler will lie at an angle to the floor to allow the
boiler outer casing (5) to be removed.
B
The inner sleeve (2) opens as shown in figure 23.
B
Remove the protective wrapping (4).
1. Undo but do not remove the two screws at the bottom
of the boiler
2. Undo the two screws at the top (see fig. 24).
3. Remove the outer case (5).
B
Remove any packaging within the boiler and the
packaging base (3).
Fig. 21 Remove outer carton
Fig. 22 Lay boiler down
Fig. 23 Remove packaging
Fig. 24 Outer case screw removal
CAUTION:
Hanging the boiler
B
Remove the plastic strip fitted to pipes
before hanging the boiler.
1
2
3
6720643895-18.1Wo
2
3
6720643895-19.1Wo
3
4
2
6720646195-08.1Wo
3.
5
2.
1.
6720646195-09.1W
o