Installation
|
23
AU/NZ
6 720 646 195a (2010/11)
4
Installation
4.1
Unpacking the wall frame and ancillary
items
1. Wall mounting frame
2. Wall mounting template
3. Inner packaging
4. Installer pack
5. Bottom panel
6. Front fascia
7. Syphon assembly
8. Adapter pack
Fig. 19 Unpacking
Handling instructions:
•
It is advised that two people are used to carry the
carton from the van to the point of delivery.
•
Once the carton has been delivered, the outer carton
is removed first. Care should be taken when releasing
the straps. If a sharp implement is used make sure the
outer carton is not pierced and that the implement is
used in such a way so that it may not cause personal
injury.
•
All sharp objects must be covered or the blade
retracted after use and put away in a safe place.
Care should be taken when lifting the boiler from the
base and the proper technique for safe lifting of any
heavy object should be strictly observed.
1. Remove straps and open the top of the boiler
packaging.
2. Remove the wall mounting frame (1) and wall
mounting template (2) and from the packaging.
3. Remove the boiler bottom panel (5), front fascia (6),
hardware literature pack (4) and syphon assembly (7)
from the carton.
WARNING:
All the previous “pre-
installation” sections must be read and the
requirements met before starting boiler or
flue installation.
CAUTION:
Lifting and carrying.
B
Only lift a manageable weight, or ask for
help.
B
Bend the knees and keep the back
straight with feet apart, when lifting or
putting down heavy objects.
B
Do not lift and twist at the same time.
B
Lift and carry object close to the body.
1
3
2
4
5
6
7
6720646195-21.1W
o
8
NOTE:
B
Before installing the boiler, ensure that
the system has been cleaned as
explained on page 11
.