28
|
COMMISSIONING
Product Name
6 720 ... ... (YYYY/MM)
Commissioning
Page
Unit
Values
Comment
1
Fill the heating system and check for leaks
2
Record gas values
Wobbe index
Calorific value
kWh/m
3
3
Check gas supply for leaks
Bleed gas supply
4
Pressurise the heating system and record the value
bar
5
Check the flue inlet and exhaust, and connections
6
7
Set the gas type, if required
8
Commission burner and controls
9
Measure and record gas supply pressure
mbar
10
Measure flue gas values and record
Full load
Partial load
- Flue gas pressure
Pa
- Flue gas temperature (gross) t
A
°C
- Air temperature t
L
°C
- Flue gas temperature (net) t
A
- t
L
°C
- CO
2
or O
2
content
Vol. %
- Flue gas losses q
A
%
- CO content (air free)
ppm
- Supply air CO
2
or O
2
content when operating room sealed
Vol. %
11
Check for leaks during operation
12
Functional tests
Measure ionisation current
13
Refit casing panels
14
Inform homeowner and hand over documentation
15
Correct installation by approved installer
Signature
16
Homeowner
Signature
Table 16 Commissioning checklist
Содержание Condens 2000F16 Regular boiler
Страница 60: ...60 FAULT FINDING AND DIAGNOSTICS Product Name 6 720 YYYY MM ...
Страница 61: ...FAULT FINDING AND DIAGNOSTICS 61 6 720 YYYY MM Product Name ...
Страница 62: ......