4. Installation
The system may be installed and wired only by qualified
electricians in accordance with applicable safety regulations
4.1 Unpacking and Inspection
1. Moving to the installation site
The UPS has wheels making it easy to move to the installation site
after it has been unpacked. However, if the receiving area is far from
the installation site, we recommend you to move the UPS by using a
pallet jack or a lifter before you start to unpack the UPS.
2. Unpacking and inspection
1) At the installation site, the utmost care must be taken when
removing the packaging in order to avoid damaging the equipment.
Check all packaging materials to ensure that no items are missing.
The shipping package contains:
● A UPS
● A user manual
● A parallel cable
●
Parallel port cover plate
Remove the packaging following the sequence illustrated in Fig. 4-1 to