(4) Build the third layer of the ring with 10 common bricks (G). Place the bricks one by one
on the second
layer
ring, except for the two bricks touching the gap in Figure 2.
See Figure 3.
(5) Install the firebowl (I) in the middle of brick ring, making sure the lip edge of the bowl is
on the top of the bricks. The control panel will sit in the gap made in step
3
.
See Figure
4.
(6) Put the two final common bricks (G) on the empty position above the control plate. Then
pull-out the overmuch hose in the brick ring and clamp the clip (F) on the gas hose beside
the slot brick (H) to avoid the gas hose to be inserted too long into the brick ring.
See
Figure 5.
7