BRT7989/7200
Page 14
Assembly STEP 7
Hardware Required
HANDLE BAR ASSEMBLY
On the left side, insert
Left Handle Bar (#14)
into the opening at the
tip of
Left Coupler Bar (#05)
. Align the holes of the
Left Handle Bar
(#14)
and
Left Coupler Bar (#05)
and secure from the side using one
Bolt (#32)
, one
Spring Washer (#47)
and one
Arc Washer (#49)
.
Then, continue from rear/front with two
Carriage Bolts (#27)
, two
Arc
Washers (#50)
, two
Spring Washers (#48)
and two
Cap Nuts (#43)
.
Repeat this process on the other side using
Right Handle Bar (#15)
and
Right Coupler Bar (#06)
.
#32 Bolt (M8 x 15mm)
[2 pieces]
#27 Carriage Bolt (M6 x 38mm)
[4 pieces]
#47 Spring Washer (M8)
[2 pieces]
#49 Arc Washer (M8)
[2 pieces]
#48 Spring Washer (M6)
[4 pieces]
#50 Arc Washer (M6)
[4 pieces]
#43 Cap Nut (M6)
[4 pieces]
Содержание TRIO-TRAINER BRT7200
Страница 31: ...This page is left blank intentionally ...