BRM2720X / 2780
Page
12
Assembly STEP 6
Remove the Bolts
(#30)
that are pre-assembled on the back of the
Monitor
(#61)
and set them aside as they will be used in a later
process.
Connect the Monitor Wire (Upper)
(#62)
to the Monitor
(#61)
and
connect the Pulse Sensor Wire
(#60)
to the Monitor
(#61)
.
Secure the Monitor
(#61)
to the bracket of the Center Post
(#02A)
with four Screws
(#30)
that were previously removed.
Hardware Required
#
30
Screw (M5x12mm)
[4 Pieces]
A
B
Содержание BRM2720X
Страница 2: ...This page is left blank intentionally ...
Страница 23: ...This page is left blank intentionally ...