Form No. 1045-69 r5/21/14 © 2014 Bobrick Washroom Equipment, Inc. Printed in U.S.A.
36''
(915mm)
21''
(535mm)
CL Panel
42''
(1070mm)
15''
(381mm)
CL Panel
18''
(455mm)
21''
(535mm)
36''
(915mm)
Set panel on support(s)
and in brackets.
12''
(305mm)
15''
(381mm)
42''
(1070mm)
Set panel on support(s)
and in brackets.
WALL HUNG URINAL SCREENS
STEP 1
Fig. a: Layout Walls and Install Brackets.
Fig. b: Put Screen in Place.
A. Using the wall brackets as templates, measure and mark the location of all mounting holes, according to
dimensions shown in illustrations (Fig. a, b).
B. Use #19 (.166) drill bit for 2" (50mm) deep pilot holes into adequate wall backing.
C. Secure wall brackets with #12 x 2" screws.
A. Position panel so that it contacts the heads of the screws that attach the brackets to the wall.
B. Using brackets as templates, drill #19 through the panel.
C. Fasten panel to brackets with #10-32 x 1-1/4'' (#10-32 x 1-3/4'' 1040 only) screw and #10-32 acorn nut.
Page 7
For 42" (107cm) High Screens
For 48" (122cm) High Screens
For 42" (107cm) High Screens
For 48" (122cm) High Screens