Form No. 1045-69 r5/21/14 © 2014 Bobrick Washroom Equipment, Inc. Printed in U.S.A.
23''
(535mm)
23''
(535mm)
16-3/8''
(416mm)
Upper
Nut
Trim End with Label
12''
(305mm)
POST-TO-CEILING URINAL SCREENS
STEP 3
Fig. 3c: Install Post
Fig. 3d: Attach Panel
A. Post is furnished in 10' -0" (305cm) lengths. Post is to
be field cut on end with label attached.
Follow instructions on label to cut post to your job
conditions.
B. Fasten three brackets with No. 10 x 3/8" (10mm)
screws.
Be sure short end of post is towards floor to assure
proper mounting of panel to brackets.
C. Place post over floor base plate. Be sure brackets are
on panel side. Turn upper nut raising post to engage
on ceiling base plate.
Caution: Use care when raising post to prevent
damage to ceiling.
D. Install shoe with No. 6 x 1/4" (6mm) screws. Screws to
be on panel side of post. Be sure to engage retainer at
floor.
Position panel so that it contacts the heads of the
screws that attach the brackets to the post. Drill No. 19
holes x 3/4" (19mm) deep. Fasten panel to brackets
on post with #1002499 screws for 1/2" (12mm) panels
and #1002500 for 1" (25mm) panels. Make sure that
post is plumb and straight. Drill pilot holes and fasten
wall brackets to panel.
Page 6