Grounding Deployment Instructions
www.BlueSkyMast.com
877-411-6278
Page
56
Grounding Bracket
BST2-P-B205-GND-000
Stainless Steel Cable w/Stakes
BST2-P-C225-GND-000
Grounding Bag
BST2-B-P300-BAG-GND
Surface Wire Grounding Kit — BST2-K-L104-GND-000
GROUNDING DEPLOYMENT INSTRUCTIONS
1. Locate grounding bracket and attach to the base pole of the mast.
2. The grounding bracket should be attached to the middle of the base
pole to provide the best grounding.
3. Locate the grounding cables and place them at the base of the mast.
Contents of Surface Wire Grounding Kit
4. Remove the wing nut from the post without the Bronze ECLE connector
and attach the ends of the grounding cables.
5. Connect one end of each of the grounding cables to the grounding
bracket post an tighten back down the wing nut.
6. If additional equipment grounds are required, attach them to the
Bronze ECLE connector.
7. Extend the grounding cables away from the base pole at 120 degree
angles from each other.
8. Position the 1st stake of each cable at the free end furthest from the
base of the mast.
9. Evenly space the remaining stakes of each cable at an interval of 4.5 ft.
10. Hammer the stakes into the ground making sure that the head of each
stake contacts the ground.
4
5
6
7
8
Содержание AL1 STANDARD Series
Страница 54: ...Datasheet AL1 Standard Series 15 Meter System www BlueSkyMast com 877 411 6278 Page 54...
Страница 55: ...Datasheet AL2 Standard Series 15 Meter System support blueskymast com 877 411 6278 Page 55...
Страница 58: ......
Страница 59: ......
Страница 60: ......
Страница 61: ......
Страница 62: ......
Страница 63: ......
Страница 64: ......
Страница 65: ......
Страница 66: ......
Страница 67: ......
Страница 68: ......
Страница 69: ......
Страница 70: ......
Страница 71: ......
Страница 72: ......
Страница 73: ......
Страница 74: ......
Страница 75: ......