www.BlueSkyMast.com
877-411-6278
Page
44
AL1 / AL2 Standard Series User Manual
Primary and Secondary Guying (2 - 15 Meters)
8. Add the Mounting Pole
A. Locate the mounting pole (it is 1/2 the length of a mast pole) and slide it over the silver
insert of the first mast pole in the tripod.
B. Make sure the castle cut on both poles nest fully together and there is no silver visible in
the seams of the joint.
8.A
8.B
8.C
10. Add the Primary Guy Ring
A. Locate the
Red Primary Guy Ring i
n the Wheeling Carry Bag.
B. Remove the push pin and slide it over the top of the mounting
pole.
C. Pin it to the last hole on the bottom of the mounting pole.
11.
Attach Your Device or Devices to the Mast
A. Attach your devices to mounting pole / mast.
B. Secure any loose cables to the mounting pole.
WARNING:
Use Velcro straps or some other form of cable management to secure in-
strument cables to the mast to reduce strain on cables and prevent damage to cable
connections. Loose cables can also cause the mast to lean to one side and affect per-
formance and safety
9.B
9. Add the Secondary Guy Ring
A. Locate the
Blue Secondary Guy Ring
in the Wheeling Carry Bag.
B. Release the cam lock on the Blue Secondary Guy Ring and slide it
over the top of the mounting pole until it rests on top of the tri-
pod. DO NOT lock it into place at this time.
10.B
11.A
Содержание AL1 STANDARD Series
Страница 54: ...Datasheet AL1 Standard Series 15 Meter System www BlueSkyMast com 877 411 6278 Page 54...
Страница 55: ...Datasheet AL2 Standard Series 15 Meter System support blueskymast com 877 411 6278 Page 55...
Страница 58: ......
Страница 59: ......
Страница 60: ......
Страница 61: ......
Страница 62: ......
Страница 63: ......
Страница 64: ......
Страница 65: ......
Страница 66: ......
Страница 67: ......
Страница 68: ......
Страница 69: ......
Страница 70: ......
Страница 71: ......
Страница 72: ......
Страница 73: ......
Страница 74: ......
Страница 75: ......