877-411-6278
Page
45
AL1 / AL2 Standard Series User Manual
Primary and Secondary Guying (2 - 15 Meters)
Helpful Hint:
Walk the 1
st
guy rope in the opposite direction of the sun. This will help you align
the 2
nd
guy rope (opposite of 1
st
guy rope) without interference of the sun.
13. Attach the 1st Primary Guy Rope.
A. Attach the red clip on the free end of the 1
st
primary guy rope to the ROUND HOLE on
the red primary guy ring.
B. Unwind the 1
st
primary guy rope while walking away from the mast taking one NORMAL
step for each meter of height of the mast. Example 15 meters equals 15 NORMAL steps.
Do not use exaggerated steps.
C. Drive a guy stake into the ground at the length that you determined based on the previ-
ous step.
D. Standing in place above the guy stake, unwind the rest of the guy rope off the handle
and then attach the stainless steel clip onto the guy stake.
E. For mast heights of 10+ meters - Slide the handle towards the mast approx. 7 feet. This
will take up the slack in the guy rope during deployment and prepare you for incremental
guying.
12.
Locate the four Primary Guy Ropes and Guy Stakes
A. Locate the four Primary Guy Ropes with Red Clips and four galvanized steel guy stakes
13.A
13.D
13.E
13.B
Содержание AL1 STANDARD Series
Страница 54: ...Datasheet AL1 Standard Series 15 Meter System www BlueSkyMast com 877 411 6278 Page 54...
Страница 55: ...Datasheet AL2 Standard Series 15 Meter System support blueskymast com 877 411 6278 Page 55...
Страница 58: ......
Страница 59: ......
Страница 60: ......
Страница 61: ......
Страница 62: ......
Страница 63: ......
Страница 64: ......
Страница 65: ......
Страница 66: ......
Страница 67: ......
Страница 68: ......
Страница 69: ......
Страница 70: ......
Страница 71: ......
Страница 72: ......
Страница 73: ......
Страница 74: ......
Страница 75: ......