5.5
Structure of GREENROCK three phase
Place the battery stacks at their destination and align
them roughly.
The cabling of the batteries must be on the front side.
Use appropriate lifting aids for this purpose.
The distance from threaded bolt to threaded bolt is
400 mm (central).
If the CLADDING option is selected:
(without which you can skip this step)
Slip over the eyeglass-shaped base plate, which
serves as a rough positioning template.
The Velcro fasteners must point outwards and
upwards.
Be careful not to damage the cabling.
Place the base/intermediate plate on the battery
stacks.
The cable openings must be located on the rear side.
Next, place and centre the base plate of the junction
box.
The cable openings must be located on the rear side.