Fornacher Strasse 12
Tel43 (720) 010 188
A-4870 Vöcklamarkt
Email:
Austria
www.bluesky-energy.eu
January 10, 2020/greenrock-heimspeicher_installations- & inbetriebnahmehandbuch_v02_en
12
(5)
INSTALLATION OF GREENROCK HOME ENERGY STORAGE
SYSTEM
5.1
Unpacking
On receipt of the delivery, check that the tilt and shock indicator has not tripped (if fitted) and that the packaging and boxes have
not been punctured or broken.
Unpack the individual components carefully and check the completeness of the scope of delivery, and also check whether
electrolyte has leaked or whether connections are damaged or missing.
If you notice any damage or missing components, please contact your distributor or sales partner immediately. Please also include
photos in your documentation of the damage.
5.2
Transport
Use suitable equipment to move and transport the battery stacks. The stacks can be transported with an appropriately designed
pallet truck. Position the product so that the cabling is not damaged.
During transport, make sure that the battery stacks are not tilted more than 45 degrees!
5.3
Installation variants
GREENROCK Energy Storage systems are always mounted on the wall, in a corner.