25
Commissioning
Before leaving the converted installation;
1.
Check all gas connections for leakages using soapy water or other gas detecting equipment.
2.
Check the following functions in accordance with the operating instructions specified in the
‘Operation’ section of this manual.
•
Light the Pilot Burners.
•
Light the Main Burners.
•
Check the Low Fire open burner operation.
•
Check the High Fire open burner operation.
•
Check the Griddle Burner operation (If fitted).
•
Check the Oven Controls operation.
•
Ensure that all the controls operate correctly.
•
Ensure that the operating pressure remains correct.
3.
Ensure any adjustments done to components that have the adjustments / settings sealed (e.g. paint
sealed) are re-sealed.
NOTE: If for some reason it is not possible to get the appliance to operate correctly, shut off the
gas supply and contact the supplier of this appliance.
Gas Specifications
- Australia / New Zealand Only
*
The burner operating pressure is to be measured at the manifold test point with two
burners operating at the ‘High’ setting. The operating pressure is ex-factory set, through the
appliance regulator and is not to be adjusted, apart from when carrying out gas conversion, if
required. (Refer to the ‘Gas Conversion’ section for details).
WARNING:
D
O
NOT
USE
A
NAKED
FLAME
TO
CHECK
FOR
GAS
LEAKAGES
.
Gas Conversion and Specifications
Nat. Gas
LP Gas (Propane)
Open Burners
Main Burner Injectors
Ø 2.45 mm
Ø 1.50 mm
Pilot Burner ('PF' Option Only)
0.30 0.20
Griddle
Main Burner
Ø 2.10 mm
Ø 1.30 mm
Pilot Burner
0.35 0.23
Main Burner
Ø 2.40 mm
Ø 1.40 mm
Pilot Burner
0.35 0.23
Low Fire
0.90 mm
0.55 mm
Burner Aeration Setting
Fully Open
10 mm
Supply Pressure
1.13 - 3.40 kPa
2.75 - 4.50 kPa
Operating Pressure
0.95 kPa (*)
2.6 kPa (*)
Gas Regulator Cap Screw
Oven
Содержание Evolution G504
Страница 7: ...5 Dimensions G504 G504D G504C G504B ...
Страница 8: ...6 Dimensions G528 G528D G528C G528B G528A ...
Страница 31: ...29 ...