21
Charge on.
4.3 Configuration
4.3.1
Factory Settings
Clicking on the “Configuration” and then “Factory Settings” link will bring up the
following screen:
Charge Point Vendor
The name of the charge point vendor.
Charge Point Model
The model of the charge point.
Charge Point Serial
The unique serial number of the charge point.
Hardware Version
The hardware version of the charge point.
Firmware Version
The software version of the charge point.
Production Date
The date when the charge point is made.
Number Of
Connectors
Number of connectors of the charge point.
Connector Type
Type of the output cable connector.
Max Amperage
Connector
The maximum current output for the charge
point.
Protocol Name
The communication protocol between charge point and
BOS.