
Version 1.04
March 2011
APEX cbt
Page 21
www.blazeking.com
INSTALLATION INSTRUCTIONS
DAMPER MOTOR(S) CONNECTION
The damper motor opens and closes the flap which controls the combustion air. Both primary air (front
of unit) and secondary air (back of unit) are controlled by a damper motor. There is a central connection
for the damper motors in the junction box on the side of the furnace. This connection is in later diagrams
referred to as “damper motor”. It controls both damper motors and involves a bypass switch, which
prevents the primary air damper motor from opening when the bypass is open.
NEVER CONNNECT DAMPER MOTORS TO 120V. CONNECT ONLY TO 24V
To primary
air damper
To secondary air
damper motor
To bypass
switch
Damper motor connection
CONNECT ONLY TO 24V
Junction
box
Содержание APEX CBT
Страница 37: ...Version 1 04 March 2011 APEX cbt Page 37 www blazeking com BRICK LAYOUT ...
Страница 40: ...Version 1 04 March 2011 APEX cbt Page 40 www blazeking com Stainless steel same cleaning procedure ...
Страница 41: ...Version 1 04 March 2011 APEX cbt Page 41 www blazeking com ...
Страница 42: ...Version 1 04 March 2011 APEX cbt Page 42 www blazeking com ...